HC151+
MULTI / HC200+
MULTI
ENGLISH
1.
GENERAL RULES
Carefully read the warnings listed below as they provide important information regarding the rules for
installation, use and maintenance.
Please keep this manual carefully for further reference.
1.1
INSTALLATION STANDARDS
Install the dosing pump so that it is easily accessible whenever maintenance is required. Never
obstruct the place where the dosing pump is located.
The servicing and maintenance of the dosing pump and all its accessories must always be carried out
by qualified personnel.
AQUA SpA cannot be held responsible for damage to persons or things caused by poor installation or
incorrect use of the dosing pump.
Check that the ground is fully functional and corresponds to the regulations in force. Make sure
there is a high sensitivity differential switch (0.03 A). Check that the pump ratings are compatible
with those of the mains supply. Never install the pump directly in parallel with inductive loads
(eg motors / solenoid valves) but if necessary use an "insulation relay". Inside the pump there
are two protections: a varistor and a fuse.
THE EQUIPMENT, SUBJECT TO THIS DOCUMENT, ARE NOT INTENDED TO
BE INSTALLED AND USED IN EXPLOSIVE ATMOSPHERE ENVIRONMENTS.
IT ISN’T AN ATEX PUMP.
P: dosing pump
R: relay
I: Switcher or multi-pole
security device
E:
Motor
or
generally
inductive charge
A: supply voltage
Содержание HC151+ CI(J)
Страница 2: ...HC151 MULTI HC200 MULTI ENGLISH ...
Страница 20: ...HC151 MULTI HC200 MULTI ENGLISH Example ...
Страница 28: ...HC151 MULTI HC200 MULTI ENGLISH EXPLODED VIEWS HC151 EXPLODED VIEW ...
Страница 30: ...HC151 MULTI HC200 MULTI ADSP9500073 13 03 2020 Rev 1 0 30 36 HC200 EXPLODED VIEW ...
Страница 32: ...HC151 MULTI HC200 MULTI ADSP9500073 13 03 2020 Rev 1 0 32 36 PUMP HEAD EXPLODED VIEW ...
Страница 34: ...HC151 MULTI HC200 MULTI ADSP9500073 13 03 2020 Rev 1 0 34 36 AUTO BLEED PUMP HEAD EXPLODED VIEW ...