7.
Pull the two ribs forward and insert two pegs through the rings either side of the front door.
On flat ground use the centre rings, the bottom rings on ground sloping away from you and the
top ring on ground sloping up.
8.
Now go around the M3 Compact and place one peg in every peg ring. To ensure a taut groundsheet
- as you peg out your M3 Compact, insert the peg through both the aluminium ring of the bivvy
and that of the ground sheet. The draft skirt can now be tucked under the groundsheet.
9.
The groundsheet is slightly oversized to allow for uneven ground, so do not put excessive force
on the material of the M3 Compact while pegging out. The groundsheet is only a rough guide and
adjustments can be made in any direction at the end of the process.
10.
Finally the small frame support system (supplied) should be installed between the front pole
and the porch pole.
11.
The door is fitted with two-way zips so it may be opened from the top or bottom. The door is
longer than the bivvy so it can act as draft skirt and be tucked under the ground sheet.
M3 COMPACT
Assembly
Содержание M3 COMPACT
Страница 1: ...M3 COMPACT Instruction Guide WWW AQUAPRODUCTS CO UK ...
Страница 2: ......