background image

Base x 1 

Step 1: Base I and 4 x A 

4 x B 

Centre Support Panel J and 2 x B 

Lower centre shelf onto screws and 

tighten clamps by turning them 

clockwise. Do not overtighten.   

Make sure arrow points 

towards opening for screw 

Step 2: Back Panels L, K, 2 x D and 10 x B 

Step 3: Side Panels M, N, 12 x A 

Step 4: Cabinet lid O and 8 x C 

Position cabinet lid on the cabinet 

construction, open side pointing 

upwards. Line up screws C with 

holes and fasten, ensuring screw 

heads do not stand proud. 

Step 5: Door panels P, Q, 4 x H, 16 x F 

Fasten hinges H to door 

panels using screws F 

Attach door handles 

Attach doors to cabinet 

using screws F and 

the predrilled holes 

Insert shelves using 

pins Z 

Отзывы: