9
D
Slide-in Center Fin Installation
Once the board is inflated, slide in the large Center Fin to the fin box
and insert the push-in pin.
E
Center Deck Installation
For best performance, the center deck
chamber should always be installed and
inflated as the following steps to ensure
the highest stiffness and safety.
Step 1
.
Install the center deck chamber before
inflation.
Step 2
.
Inflate the main board chamber FIRST
up to 15 PSI.
Step 3
.
Inflate the center deck chamber up to
10 PSI.
C A S C A D E
Step 2.
15psi
Step 3.
10psi
Содержание CASCADE BT-21CAP
Страница 1: ...User s Guide CASCADE INFLATABLE SUP KAYAK HYBRID EN ...
Страница 6: ...STAND UP PADDLING SIT IN KAYAKING SIT ON TOP KAYAKING 6 USAGE SCENARIO ...
Страница 18: ...Manuel De L utilisateur CASCADE HYBRIDE SUP KAYAK GONFLABLE FR ...
Страница 23: ...FAIRE DU KAYAK PONTÉ FAIRE DU KAYAK PONTÉ FAIRE DU KAYAK OUVERT ASSIS AU DESSSUS 6 SCÉNARIO D UTILISATION ...
Страница 35: ...Benutzerhandbuch CASCADE AUFBLASBARER SUP KAJAK HYBRID DE ...
Страница 40: ...STAND UP PADDLING SUP SIT IN KAJAKING SIT ON TOP KAJAKING 6 EINSATZSZENARIOS ...
Страница 52: ...Manual de Usuario CASCADE HÍBRIDO DE SUP KAYAK INFLABLE ES ...
Страница 57: ...STAND UP PADDLING KAYAK SIT IN KAYAK SIT ON TOP 6 ESCENARIO DE USO ...