7
INSTRUCTION FOR ASSEMBLING
AND DISASSEMBLING
Pump Set Up And Inflation
A
B
1. Open the valve cap by twisting counter-clockwise. Ensure the valve is
clear from debris, sand, or dirt before releasing.
2. Push valve button in and turn counter-clockwise 90 degrees so it pops up
and is in the “OUT” position.
3. Insert the pump hose and twist it 45 degree clockwise to lock in place.
Inflate until you reach the required pressure.
12PSI minimum (10PSI for center deck chamber)
for proper inflatable boards operation and
15PSI maximum (10PSI for center deck
chamber). Over inflation will void your warranty.
Connect the pump hose to the
gauge housing and secure it tightly.
①
①
Содержание CASCADE BT-21CAP
Страница 1: ...User s Guide CASCADE INFLATABLE SUP KAYAK HYBRID EN ...
Страница 6: ...STAND UP PADDLING SIT IN KAYAKING SIT ON TOP KAYAKING 6 USAGE SCENARIO ...
Страница 18: ...Manuel De L utilisateur CASCADE HYBRIDE SUP KAYAK GONFLABLE FR ...
Страница 23: ...FAIRE DU KAYAK PONTÉ FAIRE DU KAYAK PONTÉ FAIRE DU KAYAK OUVERT ASSIS AU DESSSUS 6 SCÉNARIO D UTILISATION ...
Страница 35: ...Benutzerhandbuch CASCADE AUFBLASBARER SUP KAJAK HYBRID DE ...
Страница 40: ...STAND UP PADDLING SUP SIT IN KAJAKING SIT ON TOP KAJAKING 6 EINSATZSZENARIOS ...
Страница 52: ...Manual de Usuario CASCADE HÍBRIDO DE SUP KAYAK INFLABLE ES ...
Страница 57: ...STAND UP PADDLING KAYAK SIT IN KAYAK SIT ON TOP 6 ESCENARIO DE USO ...