background image

AQUADUCT ECO

8. Connecting the aquaduct

8. Connecting the aquaduct

8. Connecting the aquaduct

8. Connecting the aquaduct

All aquaduct variants have two electrical and two hose connections. The
left 15-pin connection serves for the power supply of the aquaduct and
always has to be connected with the PC interface circuit board. Import

Import

Import

Import----

ant: 

ant: 

ant: 

ant: Attach this plug only to the enclosed interface! It is not

not

not

not a PC stand-

ard connection! 
The USB interface of the aquaduct can be connected with the PC to
configure the integrated control unit of the aquaduct using the aqua-
suite software. For the aquaduct 240 eco mark II AC 230 V, this con-
nector is not operational!
Adjacent to the electrical connectors, the hoses for coolant supply and
return have to be connected. Supply and return connector are marked
by icons next to the connector. To connect the hoses, at first the fittings
included in delivery have to be screwed in. If alternatively special hoses
are to be used, fittings with G1/4 thread can be used. 

- 16 -

Aqua Computer GmbH & Co. KG

© 2007-2016

Gelliehäuser Str. 1, 37130 Gleichen

Содержание Aquaduct 240 eco

Страница 1: ...nd assembly manual Operating and assembly manual Operating and assembly manual eco series eco series eco series eco series 240 eco and 360 eco eco mark II January 2016 2007 2016 Aqua Computer GmbH Co KG 1 Gelliehäuser Str 1 37130 Gleichen Germany aquaduct ...

Страница 2: ...ng kits Socket 775 1366 AM2 11 6 3 Installation of 2 hole mounting kits Socket 754 939 F 12 6 4 Examination and connection to the cooling system 13 6 5 Proper connection of cuplex kryos and cuplex PRO 13 7 Installation of the PC interface circuit board 14 7 1 Connector power 14 7 2 Connector pump rpm signal not for aquaduct 240 eco mark II AC 230 V 14 7 3 Connector flow aquaduct 360 eco mark II on...

Страница 3: ...ng solution It has convincing design and a cooling performance which sets standards at a minimum noise level Furthermore it is foolproof to handle secure and compact It got the name since the water runs over a kind of bridge at the top and falls down then on the other side The combination of a passive and an active radiator result in a very good overall cooling performance under changing condition...

Страница 4: ...ctors possess a pressure resistance of more than 10 bar when using suitable hoses guaranteed by the manufacturer This pressure is water cooling systems is far lower than this value In addition to the aquaduct cooling system you merely need the water coolers matching your PC s components As a general rule all water blocks produced by Aqua Computer can easily be disassembled to al low for cleaning a...

Страница 5: ...at are glued on there is a risk of damaging the hardware a risk of damaging the hardware a risk of damaging the hardware a risk of damaging the hardware 4 To connect the water blocks for the PC hardware it is normally 4 To connect the water blocks for the PC hardware it is normally 4 To connect the water blocks for the PC hardware it is normally 4 To connect the water blocks for the PC hardware it...

Страница 6: ...ture for this purpose since a failure of the cooling or switch off feature for this purpose since a failure of the cooling system is not audible Should the temperature of the processor exceed system is not audible Should the temperature of the processor exceed system is not audible Should the temperature of the processor exceed system is not audible Should the temperature of the processor exceed 6...

Страница 7: ...at the surfaces on the outside get very hot Take measures to pro that the surfaces on the outside get very hot Take measures to pro that the surfaces on the outside get very hot Take measures to pro tect the device from touching particularly if children or domestic an tect the device from touching particularly if children or domestic an tect the device from touching particularly if children or dom...

Страница 8: ...3061 flow sensor high flow order code 53068 4 Arranging the elements of the cooling system 4 Arranging the elements of the cooling system 4 Arranging the elements of the cooling system 4 Arranging the elements of the cooling system On arranging the elements of the cooling system you should observe the following essential points All elements have to be flown through sequentially one after the other...

Страница 9: ...hment of the hose from a connector the first two centimeters have to be cut off to guarantee a secure operation 2 Insert the hose into the connector up to the limit stop When inserting the hose a first limit stop will be felt which has to be overcome with some effort If you want to be on the safer side you can mark the hose with a felt tip pen up to where you have to insert it Depending on the con...

Страница 10: ...CPU water block cuplex series 6 Installation of the CPU water block cuplex series 6 1 Preparing the installation of the CPU cooler 6 1 Preparing the installation of the CPU cooler 6 1 Preparing the installation of the CPU cooler 6 1 Preparing the installation of the CPU cooler Now that you understand how the connection system works you can be gin installing the CPU cooler As mentioned earlier with...

Страница 11: ...1366 AM2 6 2 Installation of 4 hole mounting kits Socket 775 1366 AM2 Should be more than four feathers included in the screw set please use the four softer feathers With the so called four hole mounting kit the cuplex is fixed directly on the motherboard with four screws and pressure springs which are used as screw springs Therefore you have to fasten the four screws first For that purpose detach...

Страница 12: ... visible slit is left between the coils You can check this by sliding a piece of paper between the coils as illustrated on the photo If this is not possible you fastened the knurled bolts too much and you have to loosen them Also make sure that the cuplex does not rest on the cover of the barring mechanism of the socket but on the core of the processor 6 3 Installation of 2 hole mounting kits Sock...

Страница 13: ...ateral connection In order to attain the full performance of the wa terblock correct connection of inlet and outlet is crucial When operated with reversed flow direction the cooling performance is significantly reduced 2007 2016 Aqua Computer GmbH Co KG 13 Gelliehäuser Str 1 37130 Gleichen Germany Finally check again if the cooler rests plane on the core of the pro Finally check again if the coole...

Страница 14: ...or aquaduct 240 eco mark II AC 230 V for aquaduct 240 eco mark II AC 230 V for aquaduct 240 eco mark II AC 230 V for aquaduct 240 eco mark II AC 230 V This connector supplies a artificial rpm signal that is generated by the con trolling unit of the aquaduct This rpm signal can for instance be configured to be switched off in case of an alarm and thereby can be used for status monitoring of the aqu...

Страница 15: ...e fans the aquaduct and any connected component can overheat and be permanently damaged Pin assignment Pin 1 GND Pin 2 0 12 V Pin 3 rpm signal 7 5 Connector external standby 7 5 Connector external standby 7 5 Connector external standby 7 5 Connector external standby Without function for the aquaduct eco model series 7 6 Connector 7 6 Connector 7 6 Connector 7 6 Connector alarm relay alarm relay al...

Страница 16: ...d connection The USB interface of the aquaduct can be connected with the PC to configure the integrated control unit of the aquaduct using the aqua suite software For the aquaduct 240 eco mark II AC 230 V this con nector is not operational Adjacent to the electrical connectors the hoses for coolant supply and return have to be connected Supply and return connector are marked by icons next to the c...

Страница 17: ... of the aquaduct with the Double Protect Ultra coolant supplied with the aquaduct If the profile is filled almost up to the upper edge you can start the aquaduct by establishing the power supply The computer must be he computer must be he computer must be he computer must be turned off during the complete filling process since no sufficient cooling turned off during the complete filling process si...

Страница 18: ...ill appear in the left profile and the level will rise slowly until water flows back into the right profile via the bridge Refill coolant until the left profile is completely filled and only 2 3 cm about 1 inch of air remains in the right profile then reinsert the sealing screw Important Important Important Important If you hear rattling noises from the pump they are most likely caused by air insi...

Страница 19: ...pumps produce a corresponding flow depending on the fill level of the aquaduct and their control curve it is possible with a spe cial measurement to draw conclusions on the filling level of the aqua duct After filling the aquaduct and after changes at the cooling system a calibration of this measuring is necessary After that the fill level is measured at every start of the aquaduct and is shown in...

Страница 20: ...ges in material regularly Should they get brittle or have scratches you should exchange them After you read this manual completely we wish you a successful installa tion of you water cooling system and hope you will enjoy our products If you do have any more questions we will be happy to help you per e mail or in our support forum 20 Aqua Computer GmbH Co KG 2007 2016 Gelliehäuser Str 1 37130 Glei...

Отзывы: