I N S T A L L A T I O N I N S T R U C T I O N S
1
4
3
5
6
2
1. Control
Box
2. Cell
3. Flow
switch
4. Power / Timer
5. Filter
6. Pump
7. Spa
line
The system comes in three sections, the Control Box, Cell and Flow Sensor. They are manufactured from the
latest corrosion resistant materials to give you years of trouble free use, and installing them in the most
sheltered position from sun and water will protect them from extreme weather conditions for years to come.
Safety Measures
1. Only operate the system with an approved flow sensor.
2. See safety measures and warnings on page 2 of this manual.
Additional Materials Required
1. PVC solvent cement and priming fluid
6. WD-40
2. Hacksaw or pipe cutters
7. Silicone Sealant (NO NOT USE silicone glue or
3.
Screwdrivers
petroleum
jelly).
4. Drill
8. Pipe adaptors (i.e. reducer couplings) if
5. Teflon Tape (a.k.a. Plumber’s Tape)
needed for systems with 1 ½ inch plumbing
7
4