AQC QDuct Скачать руководство пользователя страница 4

 

 

 
 

 

Due to extreme lightweight QDuct, a minimum of every 
third support should be secured to the building roof deck. 

 

 

 

Refer to roofing support manufacturer guidelines for local 
code requirements. 

 

 

CONNECTING QDUCT

® 

SECTIONS

 

 

 

 

Step 1:

 

 

Apply QDuct® Sealant to each section of duct. 

 

Sealant should be applied to the ends of both the 
internal duct layer and the outer duct layer. An 
additional bead must be applied around the entire 
circumference of both the 3” internal interlocking 
surface and the 3” protruding interlocking surface. 

 

The sealant must be a continuous bead and a 
minimum of 3/8”. 

 

 

OUTER LAYER 

INTERNAL LAYER 

 
 
 

Step 2:

 

 

he QDuct is designed for a 3” overlap of the interior and exterior layers for a male-female style 

connection. 

 

Press and hold the interlocking sections of duct together. Maintain full pressure from both sides 
until the sealant is visibly seeping out of the joint both externally and internally. While 
maintaining full connecting pressure inspect the exterior of the joint to ensure that sealant is 
visibly seeping out. Apply additional sealant to fill any observed voids in the seam. Maintain full 
connecting pressure until all of the tiger connecting clips are properly fastened. 

Caution:

 

Failure to maintain sufficient connecting pressure will result in an incomplete seal causing air 
leakage and potential damage to the duct system. 

 

 

Содержание QDuct

Страница 1: ...Installation Instructions...

Страница 2: ...engineered duct system methods Use of non approved accessories and or material will void the warranty QDuct is fabricated using SMACNA guidelines for Phenolic Duct Construction Standards ANSI SMACNA...

Страница 3: ...h the drawing and the list of material AQC recommends installing QDuct from the unit outward DUCT SUPPORTS AQC recommends that duct supports be used in compliance with SMACNA guidelines for Phenolic D...

Страница 4: ...3 8 OUTER LAYER INTERNAL LAYER Step 2 The QDuct is designed for a 3 overlap of the interior and exterior layers for a male female style connection Press and hold the interlocking sections of duct tog...

Страница 5: ...er Step 3 5 Smooth the external sealant with a finger or sealant tool pushing the sealant into the joint as it is being smoothed Step 4 Apply the AQC provided UL 181 tape over the tiger clips and exte...

Страница 6: ...ting should be on the bottom or side of the duct If side it should overlap facing down to maximize water shedding There should be no overlapping seams on the top of the duct With a squeegee apply heav...

Страница 7: ...e and ensure the duct is properly centered on the main trunk line Using a permanent marker trace around the OD of the branched duct on the main trunk line to create anoutline Use a circular saw to cut...

Страница 8: ...without factory assistance If modifications are required contact your AQC representative Due to possible leakage and damage third party access panels and doors are prohibited If access is required aft...

Страница 9: ...Duct to be connected and make sure sealant is visibly seeping out of the connection Apply additional sealant to fill any observed voids To secure the QDuct to the roof curb install a piece of hanger s...

Страница 10: ...ips and UL181 tape over the seam Other connection hardware is available for higher static systems for these different styles refer to the indoor Pal Duct installationinstructions CONNECTING QDUCT TO I...

Страница 11: ...product subjected to misuse accident or alteration This Limited Warranty does not extend to improper installation This Limited Warranty does not cover any loss caused by accidents or careless handling...

Отзывы: