AQC MAXIREACH-BD Скачать руководство пользователя страница 8

Pivoting Extension Boom

8

  8.5  Assembly (boom base pivot)

 1.

  Prepare the area where the swing boom will be installed making sure it is clear and free of 

any obstacle.

 2.

  Install boom base at appropriate or specified height. It is suggested to use minimum grade 

5 fasteners to support boom base on support structure. Boom base may also be welded to 

support structure when permitted. The loading can be quite high, ensure the boom base is 

copable of with standing the loud. It could be necessary to bolt two 1/4 m plates on either 

side of a ciment block wall or column to secure the installation. 

CAUTION: Boom base has 

to be installed level (horizontally and vertically) to prevent "coasting" of horizontal steel 

tube.

3 .

  Once this boom base is secured to support structure, lift horizontal steel tube to pivot joint 

boom base pivot support bracket. Remove friction disks and steel pins from boom base pivot 

brackets.

4 .

  Slide horizontal steel tube pivot sections into boom base pivot brackets.

 5.

  Insert (1) friction disk over and under each pivot section.

6 .

  Using a spike, align holes of friction disks ready for steel pin insertion.

 7.

  Remove cotter pin from steel pin. Insert steel pin from the top of the boom base pivot support 

bracket until completely through. Secure with cotter pin.

 8. 

  Using the hose clamps supplied, fasten flexible hose from spiral pipe section to main exhaust 

duct.

  8.6  Assembly of optional equipment on swing boom.

  8.6.1  MAXAIR fume arm

Refer to MAXAIR installation manual. 

Note: 

The following MAXIDROP and MAXIREEL installation 

procedures should include a hanging cable with handle for lateral displacement of MAXIREACH 

extension swing boom. A.Q.C. usually supplies cable and handle. Contact factory or representative 

if piece is missing.

SUPPORT 

 

STRUCTURE

LATERAL SUPPORT BEAM

Содержание MAXIREACH-BD

Страница 1: ...tion use and maintenance This manual is property of the owner Leave with the unit when set up and start up are complete AQC Dust Collecting Systems inc reserves the right to change design and specific...

Страница 2: ...n and purpose 5 7 Components 6 8 Installation 6 8 1 Inspection of goods 6 8 1 Inspection of goods 7 8 2 Location 7 8 3 Assembly 7 8 4 Required tools 7 8 5 Assembly boom base pivot 8 8 6 Assembly of op...

Страница 3: ...using the system will have to trained on safety measures and maintenance instructions 2 INFORMATION ON THE MAXIREACH BD EXTENSION SWING BOOM Model Serial number Delivery date Date of installation Nam...

Страница 4: ...for exhaust duct connection Support bracket at end of boom for MAXAIR fume arm or MAXIDROP hose drop system 3 steps paint finish degreasing prime coat and polyurethane final coat The MAXIREACH BD swin...

Страница 5: ...into position for source capture to vacuum dust or smoke laden air into the attached equipment such as the MAXAIR fume arm Particles are vacuumed into the equipment toward an exhaust fan and into a d...

Страница 6: ...a distance from a wall or column The loading on the structure or column must be know 7 COMPONENTS 1 Boom base 2 Flexible hose connection to main exhaust duct hose clamps included 3 Boom base pivot joi...

Страница 7: ...ube until all equipment is installed It is advised to use a work platform at horizontal steel tube level to perform work around the unit Lifting device will be required for final adjustment and to lev...

Страница 8: ...o pivot joint boom base pivot support bracket Remove friction disks and steel pins from boom base pivot brackets 4 Slide horizontal steel tube pivot sections into boom base pivot brackets 5 Insert 1 f...

Страница 9: ...s such as overhead cranes light fixtures etc Usage of elbows or bends are allowed 2 Connect exhaust ductwork to fan outlet Refer to MAXIDRIVE installation manual 9 START UP 9 1 Check list Prior to sta...

Страница 10: ...movement Weekly Flexible hoses Ensure hose clamps are secured Check for cracks or tears in fabric Replace if necessary Yearly All components Check sturdiness of support base installation Check wear on...

Страница 11: ...ty customer must notify Seller in writing of the Product defect which notice shall include a reasonable description of the defect within 10 days from the date such defect is discovered or ought to hav...

Страница 12: ...ssibility of such damages or could have reasonably foreseen them 13 3 Fire and Explosion and Acceptance of Risk Customer acknowledges that improper installation or use of the Product may result in fir...

Отзывы: