AQC MAXIREACH-BD Скачать руководство пользователя страница 10

Pivoting Extension Boom

10

  10  MAINTENANCE AND INSPECTION

 

The chart indicated below shows different inspections and the frequency at which they should 

be performed.

Frequency of

 

 inspections

Components

Procedures

Daily

Pivot joints

Move extension boom left and right and ensure 

 

boom moves in desired location.

Support base

Push extension boom up and down. Ensure there 

 

is no excessive “play’’ in movement.

Weekly

Flexible hoses

Ensure hose clamps are secured.

Check for cracks or tears in fabric. Replace if necessary.

Yearly

All components

Check sturdiness of support base installation.

Check wear on pivot friction discs and steel pins.

Check all welds.

Problem

Probable cause

Solution

Extension boom does 

not stay in place

Boom base not level

Ajust level on boom base.

Friction discs worn out

Replace friction disks.

Insufficient suction 

 

of dust or smoke

Tear or hole in flexible 

hose fabric

Replace flexible hose.

Hose clamps loose

Tighten clamps or replace if necessary.

  11  TROUBLESHOOTING

Содержание MAXIREACH-BD

Страница 1: ...tion use and maintenance This manual is property of the owner Leave with the unit when set up and start up are complete AQC Dust Collecting Systems inc reserves the right to change design and specific...

Страница 2: ...n and purpose 5 7 Components 6 8 Installation 6 8 1 Inspection of goods 6 8 1 Inspection of goods 7 8 2 Location 7 8 3 Assembly 7 8 4 Required tools 7 8 5 Assembly boom base pivot 8 8 6 Assembly of op...

Страница 3: ...using the system will have to trained on safety measures and maintenance instructions 2 INFORMATION ON THE MAXIREACH BD EXTENSION SWING BOOM Model Serial number Delivery date Date of installation Nam...

Страница 4: ...for exhaust duct connection Support bracket at end of boom for MAXAIR fume arm or MAXIDROP hose drop system 3 steps paint finish degreasing prime coat and polyurethane final coat The MAXIREACH BD swin...

Страница 5: ...into position for source capture to vacuum dust or smoke laden air into the attached equipment such as the MAXAIR fume arm Particles are vacuumed into the equipment toward an exhaust fan and into a d...

Страница 6: ...a distance from a wall or column The loading on the structure or column must be know 7 COMPONENTS 1 Boom base 2 Flexible hose connection to main exhaust duct hose clamps included 3 Boom base pivot joi...

Страница 7: ...ube until all equipment is installed It is advised to use a work platform at horizontal steel tube level to perform work around the unit Lifting device will be required for final adjustment and to lev...

Страница 8: ...o pivot joint boom base pivot support bracket Remove friction disks and steel pins from boom base pivot brackets 4 Slide horizontal steel tube pivot sections into boom base pivot brackets 5 Insert 1 f...

Страница 9: ...s such as overhead cranes light fixtures etc Usage of elbows or bends are allowed 2 Connect exhaust ductwork to fan outlet Refer to MAXIDRIVE installation manual 9 START UP 9 1 Check list Prior to sta...

Страница 10: ...movement Weekly Flexible hoses Ensure hose clamps are secured Check for cracks or tears in fabric Replace if necessary Yearly All components Check sturdiness of support base installation Check wear on...

Страница 11: ...ty customer must notify Seller in writing of the Product defect which notice shall include a reasonable description of the defect within 10 days from the date such defect is discovered or ought to hav...

Страница 12: ...ssibility of such damages or could have reasonably foreseen them 13 3 Fire and Explosion and Acceptance of Risk Customer acknowledges that improper installation or use of the Product may result in fir...

Отзывы: