PDF: 4749051511/Source:7788125767
Aptina reserves the right to change products or specifications without notice.
MT9T111_DG - Rev. B 9/10 EN
80
©2007 Aptina Imaging Corporation. All rights reserved.
MT9T111: Developer Guide
Timing Specifications
Preliminary
Timing Specifications
Power-Up Sequence for Rev2 Silicon
Powering up the Rev2 sensor requires voltages to be applied in a particular order, as
shown in Figure 44. The timing requirements are shown in Table 28. It is advised that the
user manually assert a hard reset upon power up for Rev2.
Figure 44:
Power-Up Sequence Rev2 silicon
Table 28:
Power-Up Signal Timing for Rev2 Silicon
Parameter
Symbol
Min
Typ
Max
Unit
V
DD
to V
DD
IO, V
AA
, and VAA_PIX
–
0
–
500
ms
V
DD
to V
DD
_PLL
t
1
1
–
500
V
DD
to EXTCLK Activation
t
2
–
500
–
RESET_BAR activation time
t
3
70
–
–
EXTCLKs
First serial write
t
4
100
–
–
EXTCLKs
t
3
t1
t
2
V
DD
IO, V
AA
,
VAA_PIX
V
DD
EXTCLK
RESET_BAR
t
4
SCLK
S
DATA
First Serial
Write
V
DD_
PLL