YC600 Installation/User Manual
13
4.APsystems Microinverter System Installation
Figure 12
①
. The layout of the microinverters serial numbers on the warranty card is only
suitable for general arrangement.
②
. Warranty card is located in the last page of the Appendix of this manual.
③
. You can use Scanning Gun or mobile phone to scan the serial numbers on the map
when setting ECU (see ECU manual).
4.3.9 Step 9 - Place a Warning Notice
A warning notice must be placed in such a way that anyone with access to live parts is warned
in advance of the need to switch off the parts. It is imperative to verify that the power supply,
measurement circuits (sense lines) and other parts are not isolated from the network when the
interface protection switch is open.
As a minimum, warning labels shall be placed:
On the switchboard (DNO panel and consumer unit) that has the micro-generator
connected to it;
On all switchboards in between the consumer unit and the micro-generator itself;
On, or in the micro-generator itself;
At all points of isolation for the micro-generator.
Figure 13
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15
17
16
18 19 20
22
21
APsystems Microinverter&Energy Communication Unit
Warranty Card
The APsystems Installation Map is a diagram of the physical location of each microinverter in your PV installation.
Each APsystems microinverter has a removable serial number label located on the mounting plate. Pee l the label
and affix it to the respective location on the APsystems installation map.
Installation Map Template
To register your APsystems microinverter, please mail this warranty registration card to:
emasupport@altenergy-power com
.
B A B A
B A
The APsystems Installation Map is a diagram of the physicallocation of each microinverter in your PV
installation.Each APsystems microinverter has a removable serialnumber labellocated on the mountingplate.
Peel the label and affix it to the respective location on the APsystems installation map.
Installation Map Template