APsystems YC1000-3 Installation/User Manual
11
Installation Procedures
Step 7 - Installing the AC Branch Circuit Junction Box.
Figure 8
a. Install an appropriate junction box at a suitable location on the PV
racking system (typically at the end of a branch of modules).
b. Connect the open wire end of the AC bus cable into the junction
box using an appropriate gland or strain relief fitting.
c. Wire the conductors: L1- RED; L2 - BLACK; L3 - PINK; N - WHITE;
PE – GREEN.
d. Connect the AC branch circuit junction box to the point of utility
interconnection.
Step 8 - Completing the APsystems Installation Map
Fill in the APsystems Warranty Cards, which provide system information
and the installation map. Feel free to provide your own layout if a larger
or more intricate installation map is required. The layout map provided
is designed to accommodate labels in vertical or horizontal orientation to
meet all the field PV connections.
a. Each APsystems microinverter has removable serial number
labels. Peel labels off, and affix one to the respective location
on the APsystems installation map, and affix another to the
PV module frame which is easy to see.The warranty cards can
be obtained from the appendix of this manual or APsystems
website:
b. Fill out the warranty cards and email to APsystems at
c. Register the system using your Installer Account on the
APsystems EMA. You can then use the EMA website to view
detailed performance of the PV system.
Figure 9
NOTE:
1. Step 1
~
8 can change sequence for convenience of installation.
2. Warranty card is located in Appendix last page of this manual.