                        ALTENERGY POWER SYSTEM, INC.       

 

1.

 

Important safety information 

 

This manual contains important instructions to follow during installation and maintenance of 

the APS Photovoltaic Grid-connected Micro-inverter. To reduce the risk of electrical shock 

and  ensure  the  safe  installation  and  operation  of  the  APS  Micro-inverter,  the  following 

symbols appear throughout this document to indicate dangerous conditions and important 

safety instructions. 

 

 

WARNING: 

This indicates a situation where failure to follow instructions 

may cause a serious hardware failure or personnel danger if not applied 

appropriately. Use extreme caution when performing this task. 

 

 

NOTE: 

This indicates information that is important for optimized 

Micro-inverter operation. Follow these instructions closely. 

 

 

 

 

Symbols replace words on the equipment, on a display, or in manuals. 

 

 

Trademark 

 

Caution, risk of electric shock 

 

Caution, hot surface 

 

Symbol for the marking of electrical and electronics      devices according 

to Directive 2002/96/EC. Indicates that the device, accessories and the 

packaging must not    be disposed as unsorted municipal waste and must 

be collected separately at the end of the usage. Please      follow Local 

Ordinances or Regulations for disposal or contact an authorized 

representative of the manufacturer for information concerning the 

decommissioning of equipment. 

 

CE mark is attached to the solar inverter to verify that the unit follows 

the provisions of the European Low Voltage and EMC Directives 

 

Refer to the operating instructions 

Содержание M1P-EU

Страница 1: ...ALTENERGY POWER SYSTEM INC 1 APS M1P EU Grid connected Micro inverter Installation and User Manual Version 1 2 ALTENERGY POWER SYSTEM INC All rights reserved...

Страница 2: ...LTENERGY POWER SYSTEM INC 2 Contact Information ALTENERGY POWER SYSTEM Inc 1 Yatai Road Jiaxing PR China 314050 Phone 86 21 68889199 Fax 86 21 33928752 www altenergy power com info altenergy power com...

Страница 3: ...11 Step 2 Attaching the APS Micro inverters to the Racking or the PV Module Frame 12 Step 3 Connecting the APS Micro inverter AC Cables 13 Step 4 Ground the System 13 Step 5 Connecting APS Micro inve...

Страница 4: ...s indicates information that is important for optimized Micro inverter operation Follow these instructions closely Symbols replace words on the equipment on a display or in manuals Trademark Caution r...

Страница 5: ...that the body of the APS Micro inverter is the heat sink and can reach a temperature of 80 C To reduce risk of burns do not touch the body of the Micro inverter Do NOT disconnect the PV module from t...

Страница 6: ...ich ensures that the maximum power is exported to the utility grid regardless of the performance of the other PV modules in the array When PV modules in the array are affected by shading soiling orien...

Страница 7: ...ce monitoring and analysis The APS Energy Communication Unit ECU is installed by simply plugging it into any wall outlet and providing an Ethernet or Wi Fi connection to a broadband router or modem Af...

Страница 8: ...0V 60 72 Cell 14 for 20A breaker MC 4 Type or Customize YC250I 50Hz 230V 60 72 Cell 14 for 20A breaker MC 4 Type or Customize YC500A 50Hz 230V 60 72 Cell 7 for 20A breaker MC 4 Type or Customize YC500...

Страница 9: ...C 9 The following figure shows the APS YC250 micro inverter schematic APS YC500 has two independent DC inputs with independent MPPT control and data monitoring The following figure shows the APS YC500...

Страница 10: ...r please read all instructions and warnings in the technical documents and on the APS Micro inverter system itself as well as on the PV array WARNING Be aware that installation of this equipment inclu...

Страница 11: ...tall an appropriate junction box at a suitable location on the PV racking system typically at the end of a branch of modules b Connect the open wire end of the AC branch end cable into the junction bo...

Страница 12: ...rter at each of these locations using hardware recommended by your module racking vendor WARNING Prior to installing any of the micro inverters verify that the utility voltage at the point of common c...

Страница 13: ...nnector of the next Micro inverter and so on to form a continuous AC branch circuit c Install a protective end cap on the open AC connector of the last Micro inverter in the AC branch circuit WARNING...

Страница 14: ...leting the APS Installation Map You need to fill in APS Warranty Cards which provide system information and installation map Feel free to provide your own layout if a larger or more intricate installa...

Страница 15: ...he network when the switch of the interface protection is open As a minimum warning labels shall be placed On the switchboard DNO panel and consumer unit that has the micro generator connected to it O...

Страница 16: ...ied personnel can use the following troubleshooting steps if the PV system does not operate correctly Status Indications and Error Reporting Startup LED When DC power is first applied to the micro inv...

Страница 17: ...low in order 1 Verify the utility voltage and frequency are within ranges shown in the in section 8 Technical Data of this manual 2 Check the connection to the utility grid Verify utility power is pre...

Страница 18: ...eaker connect to the inverter 2 Cover the module with an opaque cover 3 Disconnect the first AC connector in the branch circuit 4 Disconnect the PV module DC wire connectors from the micro inverter 5...

Страница 19: ...ALTENERGY POWER SYSTEM INC 19 9 Efficiency Curves YC500 EU Efficiency temperature Curves YC500 EU Efficiency Curves...

Страница 20: ...rter Refer to the APS website http www altenergy power com for a list of approved PV modules WARNING You must match the DC operating voltage range of the PV module with the allowable input voltage ran...

Страница 21: ...m Units per Branch 14 for 20A Breaker 18 for 25A Breaker Efficiency Max Inverter Efficiency 95 5 With HF Transformer Mechanical Data Operating Ambient Temperature 40 C to 65 C Operating Internal Tempe...

Страница 22: ...Maximum Units per Branch 7 for 20A Breaker 9 for 25A Breaker Efficiency Max Inverter Efficiency 95 5 with HF Transformer Mechanical Data Operating Ambient Temperature 40 C to 65 C Operating Internal...

Страница 23: ...ALTENERGY POWER SYSTEM INC 23 11 Wiring Diagram 11 1 Sample Wiring Diagram Single Phase...

Страница 24: ...ALTENERGY POWER SYSTEM INC 24 11 2 Sample Wiring Diagram Three Phase...