April identiti Inline Panel Скачать руководство пользователя страница 8

AFTERCARE 

This product has been treated with Clean & Clear™ easy clean glass treatment, a protective barrier which creates

a ‘non-stick’ surface on your glass, helping to resist lime scale build up and water spots. For further information on

Clean & Clear™ please visit www.aprilproducts.co.uk

Aftercare

Clean & Clean™ glass can be cleaned with any suitable nonabrasive glass cleaner - with PH value of between 3-

11; the coating will not be damaged. Avoid surfactants and heavily perfumed products. Vinegar and water based

products are very effective. Do not use abrasive scrubbing cleaners or equipment for cleaning. 

Warranty

Limited 5 year Warranty for Clean & Clear™ treatment: To guarantee treated surfaces will remain more repellent

than untreated glass for 5 years from start of use, as long as basic manufacturer maintenance recommendations

are followed and no harsh or abrasive cleaners are used.

Cleaning Instructions

It is important to clean your April shower enclosure after every use. Please wipe down all glass and metal parts

with a clean soft cloth. Ensure that all residual water on the glass is removed after every use.

Usage

For reliable, watertight performance from your April enclosure your shower head should not be positioned so that

the shower sprays directly onto the enclosure door. Failure to comply with this may cause the shower to leak.

Outward opening doors may cause water to drip onto the floor, please ensure that the floor covering immediately

outside the enclosure will not be affected by water.

.

APRIL PRODUCTS

North Dean Road, West Lane, Keighley, BD22 6QY

Tel: 01535 613 830    Fax: 01535 613 831

www.aprilproducts.co.uk

Содержание identiti Inline Panel

Страница 1: ...ull Terms Conditions To activate your Product Guarantee please visit www aprilproducts co uk and complete the online form Inline Panel This product should be installed by a suitably qualified and prof...

Страница 2: ...t 1 2 ID2PF017 Upright Pro le 2 3 SNPF018 Cover Strip 1 4 ID2GS044 Glass Panel 1 5 SNFT038 Cover Strip Clip 5 6 ID2FT003 Upright Pro le Cap 2 7 ID2FT012 Inline Post Cap LH 1 8 ID2FT013 Inline Post Cap...

Страница 3: ...l finishing should be effectively sealed at tray edges 3 Tiles should extend at least to the corner of the tray and a minimum of 1 9 metres from the top of the tray FIXING KIT COMPONENTS SITE CONDITIO...

Страница 4: ...1 1 Position the wall profiles to wall as shown roughly 10mm from the front of the tray 1 2 Level the frame using a spirit level 1 3 Once you are happy that the frame sits on the tray correctly mark...

Страница 5: ...wall profile to the inline panel Step 4 Place the door to the tray again and fix the wall profiles using screws ST3 9 30 Step 5 Adjust the frame to ensure that it is central between the wall profiles...

Страница 6: ...in correct position mark the wall thought the screw hole and around the wall fixing Also tighten the M8 socket set screw which you can see using the 5 32 allen key 7 3 Loose the M6 countersunk screw u...

Страница 7: ...E between the wall profile and the wall IMPORTANT Do not apply sealant on inside of the tray Sealing Outside Seal from the top of the wall profile to the bottom between the wall profile and tiles on b...

Страница 8: ...llent than untreated glass for 5 years from start of use as long as basic manufacturer maintenance recommendations are followed and no harsh or abrasive cleaners are used Cleaning Instructions It is i...

Отзывы: