![Applent Instruments Anbai AT2511 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/applent-instruments/anbai-at2511/anbai-at2511_user-manual_2954866006.webp)
6
AT2511/511C User
’
s Guide
1.
Unpacking and Inspection
Thank you for purchasing our product, please refer to this chapter before using the instrument.
This chapter describes how to set up and start the AT2511/511C DC Low Resistance Meter.
Packing List
Power Supply Requirements
Setting up the Fuse
Environmental Requirements
Cleaning
1.1
Packing List
After you receive the instrument, carry out checks during unpacking according to the
following procedures.
1.
Check that the packing box or shock-absorbing material used to package the
instrument has not been damaged.
2.
Referring to Table 1-1, check that all packaged items supplied with the meter have
been provided as per the specified optioned.
Before using the instrument, please:
Table 1-1 Included Accessories
NAME
QTY
REMARK
User’s Manual
1
AC Power Cord
1
220V/50Hz
Fuse 2
0.5A
Slow-Blow
ATL503 Kelvin Test Leads
1
Test Report
1
Product & Warranty Certification
1
If there is damaged or shortage in accessories, please contact Applent Sales Department or retailer.
1.2
Power Supply Requirements
Confirm that the power supplied to the AT2511/511C meets the following
requirements:
Voltage
:
198-252V AC
Frequency
:
47.5-52.5Hz
Consumption
:
<15VA
To prevent electrical shock, please connect to GND.
If users change power cord, please make sure reliable connection of GND.