![Applent Instruments Anbai AT2511 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/applent-instruments/anbai-at2511/anbai-at2511_user-manual_2954866011.webp)
11
Start up
Clear
Perform short-circuit zero calibration.
3.1.3
Rear panel description
Figure 3-2 Rear panel
1 RS232C
。
Reserved port, this version does not use.
2 Fuse
Holder
250V
,
0.5A fuse
3
AC Power Cord Receptacle
198V~242VAC
,
45Hz~55Hz
3.2
Power ON/OFF
3.2.1
Power up
Power ON
Power
OFF
3.2.2
Warm-up time
AT2511/511C is ready to be used as soon as the power-up sequence has completed. However, to
achieve the accuracy rating, warm up the instrument for 15 minutes.
3.3
Connect to Device under Test
3.3.1
Connection of test side
Figure 3-3 Definition of test terminal pin