
8
Day 1
ANCHOR SYSTEM INSTALLATION INSTRUCTIONS
1) Installation Location
Choose the proper location to dig for the concrete footing. Use the distance chart
on the pervious page to help you make your decision. When choosing the exact
position to dig, make sure to maximize the amount of playing surface while mini-
mizing possible driveway obstruction.
2) Digging Pier Hole
Dig hole 36" deep and 16"
square. Be sure to bell out the
bottom of the hole 20” to give
added stability to the footing.
NOTE
: If you live in an area
where the frost line is below
36" it is advisable to dig to
normal frost line.
NOTE
: Your steel plate must
be as has or higher than the
playing area to ensure the
system will adjust to 10ft.
Содержание Pro Dunk
Страница 3: ...3 Assembled Diagram Use as reference...