
10
Use the level to ensure that the anchor template (#10) it is level in all directions. Ad-
ditionally, the center line of the Anchor J-Bolts (#16) must be parallel with the edge of
the playing surface.
Pour the remaining concrete into the hole until completely full and coming out of the
top. Using a trowel, smooth the concrete to your preferred liking.
Place the assembled anchor system in hole to the point where the bottom of the black
anchor plate (#10) is flush with the top of the finished concrete.
Once completely smooth let the concrete cure. This can take up to a week. Consult
the instructions on the concrete bag for curing times and directions.
Day 1 Complete!
NOTE:
The top of the concrete needs to be
level with
or higher than your playing area
to ensure you sys-
tem will adjust to 10ft regulation height.
Содержание Pro Dunk
Страница 3: ...3 Assembled Diagram Use as reference...