16
CHAPTER 7 – INSTALLATION
Only skilled technicians, appointed by the manufacturer, or by authorized
dealers, must be allowed to carry out installation. Serious damage to people and
to the lift can be caused if installations are made by unskilled personnel.
Always refer to the exploded views attached during installation.
7.1 TOOL REQUIRED
✟
Rotary Hammer Drill D.16
✟
Hex-Key/Allen Wrench Set
✟
Masonry Bit
✟
Crow Bar For Shim Installation
✟
Hammer
✟
Chalk Line
✟
Level
✟
Medium Cross Screwdriver
✟
Open-End Wrench Set
✟
Medium Flat Screwdriver
✟
Medium Crescent Wrench
✟
Tape measure
7.2
CHECKING FOR ROOM SUITABILITY
The lift has been designed to be used in covered and sheltered places.
The place of installation must not be next to washing areas, painting workbenches, solvent or varnish
deposits. The installation near to rooms, where a dangerous situation of explosion can occur, is strictly
forbidden. The relevant standards of the local Health and Safety at Work regulations, for instance,
with respect to minimum distance to wall or other equipment, must be observed.
7.3
LIGHTING
Lighting must be carried out according to the effective regulations of the place of installation. All
areas next to the lift must be well and uniformly lit.
7.4
INSTALLATION SURFACE
The lift must be placed concrete surface sufficiently resistant. The surface must be suitable for bearing
maximum stress values, also in unfavorable working conditions. New concrete must be adequately
cured by at least 28 days minimum. For installations on raised surface, compliance with the maximum
carrying capacity of the surface is recommended.
Содержание HW-12S
Страница 1: ...Four post vehicle lift Original Operation Manual...
Страница 11: ...11...
Страница 30: ......