The Force™ 2-Stage Operation Manual
30
Revision Date 4/23/2019
3.1.2.4.
Close Valve 10 and the Evacuation Valve.
3.1.2.5.
Open the Vessel Isolation Valves once vessel is secure.
3.1.3.
Evacuating
System
3.1.3.1.
From the manual screen press “Evacuate”.
3.1.3.2.
Open the evacuation valve on the separator bank that will be online first and attach the
vacuum pump to the bottom of the evacuation valve with the supplied hose and gauge.
3.1.3.3.
Verify that the vacuum pump has the appropriate level of clean oil and then start the
vacuum pump.
3.1.3.4.
Let the system come down to between -25 to -30 inHg and maintain for several minutes.
If system does not come down, there is a leak into the system or the vacuum pump
needs service (close the evacuation valve and watch the gauge to see which it is).
3.1.3.5.
Close evacuation valve, turn off vacuum pump, remove hose and gauge.
3.1.3.6.
Acknowledge that evacuation is complete on the manual screen.
3.2.
Starting the Cycle
3.2.1.
The Cycle Parameters Screen
– To get to the Cycle Parameters Screen first go to the Main
Screen from the bottom navigation button and click on Cycle Parameters above the extractor
icons. Once on the cycle parameter screen follow the prompts on the screen which are also
listed below:
3.2.1.1.
Verify that all vessels to be run are secure.
3.2.1.2.
Close valve 10 and the Evacuation valve on separator bank(s) to be run.
3.2.1.3.
Open the two vessel isolation valves on the separator bank(s) to be run.
3.2.1.4.
Open all bottles.
3.2.1.5.
Verify that system has adequate air pressure (between 90-115psi).
3.2.1.6.
Select which mode to run the system: Continuous, Single or Double.
3.2.1.7.
Select extractor to be online at the start of the run/flow direction of the run.
3.2.1.8.
If Continuous Batch is selected, a pop up window will show at this time asking the
operator to enter an extractor vessel time interval. This is the total time each extractor will
run before coming offline (e.g. if the extractor interval is six hours and vessel A is brought
online first the system will run vessel A by itself for four hours and then bring vessel B
online with Vessel A for two hours be for switching over to vessel B solely for two hours.
NOTE
: the first vessel will run for double the amount of time of each additional interval).
3.2.1.9.
Enter Phase 1 extractor target pressure and temperature.
3.2.1.10. Enter Phase 1 desired separator temperature.
NOTE: PHASES ARE DICTATED BY THE ORIFICE.
3.2.1.11. Enter total run time.
3.2.1.12. Select separator bank to be online first.
3.2.1.13. Enter Phase 2 extractor target pressure and temperature.
3.2.1.14. Enter Phase 2 desired separator temperature.
3.2.1.15. Enter separator switch-over time.
3.2.1.15.1. If no switch-over is desired, make switch-over time longer than total run time.
3.2.1.15.2. Phases are related to which separator is online and separate from the extractors
entirely.
3.2.1.16. Save settings and continue back to the main screen.
3.2.2.
The Main Screen
3.2.2.1.
Press “Start Cycle” to begin the run.
Содержание THE FORCE 2-STAGE
Страница 21: ...The Force 2 Stage Operation Manual 21 Revision Date 4 23 2019 2 2 9 3 PLC Analog Inputs...
Страница 22: ...The Force 2 Stage Operation Manual 22 Revision Date 4 23 2019 2 2 9 4 PLC Analog Outputs...
Страница 43: ...The Force 2 Stage Operation Manual 43 Revision Date 4 23 2019 Suction Check Valve Springs Poppet...
Страница 45: ...The Force 2 Stage Operation Manual 45 Revision Date 4 23 2019 7 4 Appendix D Piping and Instrumentation Diagram...
Страница 46: ...The Force 2 Stage Operation Manual 46 Revision Date 4 23 2019...
Страница 47: ...The Force 2 Stage Operation Manual 47 Revision Date 4 23 2019...
Страница 48: ...The Force 2 Stage Operation Manual 48 Revision Date 4 23 2019 7 5 Appendix E CO2 Phase Diagram...
Страница 53: ...The Force 2 Stage Operation Manual 53 Revision Date 4 23 2019...
Страница 54: ...The Force 2 Stage Operation Manual 54 Revision Date 4 23 2019...
Страница 55: ...The Force 2 Stage Operation Manual 55 Revision Date 4 23 2019...
Страница 56: ...The Force 2 Stage Operation Manual 56 Revision Date 4 23 2019...
Страница 57: ...The Force 2 Stage Operation Manual 57 Revision Date 4 23 2019 Z...
Страница 58: ...The Force 2 Stage Operation Manual 58 Revision Date 4 23 2019...
Страница 59: ...The Force 2 Stage Operation Manual 59 Revision Date 4 23 2019...
Страница 60: ...The Force 2 Stage Operation Manual 60 Revision Date 4 23 2019...
Страница 61: ...The Force 2 Stage Operation Manual 61 Revision Date 4 23 2019...
Страница 62: ...The Force 2 Stage Operation Manual 62 Revision Date 4 23 2019...
Страница 63: ...The Force 2 Stage Operation Manual 63 Revision Date 4 23 2019...
Страница 64: ...The Force 2 Stage Operation Manual 64 Revision Date 4 23 2019...
Страница 65: ...The Force 2 Stage Operation Manual 65 Revision Date 4 23 2019...
Страница 66: ...The Force 2 Stage Operation Manual 66 Revision Date 4 23 2019...
Страница 67: ...The Force 2 Stage Operation Manual 67 Revision Date 4 23 2019...