Apeks Supercritical: The Duplex
™
Installation Manual
23
Revision Date 04/11/2019
4. Pre-Training Checklist
In preparation for training, please refer to the installation manual for unpacking and set up instructions. Below
is a checklist of what needs to be purchased or completed BEFORE scheduling your onsite training. Onsite
training is a four hour block of instruction that is NOT designed to include unpacking and set up. Incomplete
items at the time of onsite training will result in incomplete training or additional charges for rescheduling.
Our training process is as follows:
1.
Customers to reference the installation manual for instructions on un-crating and system set up.
2.
Customer to complete entire Pre-Training Checklist.
3.
A FaceTime or Skype session is required
(when available)
to ensure checklist is complete, set up is
correct and to cover basic operation and cleaning of the system.
4.
After 1 through 3 are complete, onsite training can be scheduled. There will be a 2-3 week lead time.
Pre-Training Checklist:
Below is a checklist of what needs to be purchased or completed BEFORE scheduling your onsite training.
o
Must be complete before scheduling training:
Print complete operational manual and have on site the
day of training, along with the chiller manual.
o
Must be complete before scheduling training:
Apeks system and diaphragm compressor are unpacked
and set up in its location of operation. Refer to unpacking instructions in the installation manual.
o
Must be complete before scheduling training
: See installation manual for electrical requirements of your
system. All electrical connections are to be completed before onsite training is scheduled.
o
Must be complete before scheduling training:
Purchase and have on site for training:
o
Bottles of CO
2
, gas feed, check valve free, food grade or better. Minimum requirements are:
o
(4) 75 lb. bottles for 20Lx20LD
o
4x20LD – to be determined
o
Distilled water and Propylene glycol 95/5 mix;
o
Total Gallons of mixture needed for system:
o
9 gal for indoor chiller
o
Minimum of 55 gallon barrel for outdoor chiller – check with the service department:
(740) 809-1160 option 2
o
190 or higher proof ethanol
o
Future maintenance will require:
o
Shop vacuum with a long, slim nozzle for removing material from extractor.
o
Pencil Type Belt Tension Tester;
http://apeksonlinestore.com/product/tension-tester/
o
CO
2