1. Unpacking Instructions
Apeks 2000-5LD, 20LD, 5LDx5LD, and 20LDx20LD systems are shipped in three separate crates.
One containing the chiller, one containing the diaphragm compressor and one containing the
botanical extraction system. Following are the steps for removing the system from the crates and
making service connections for initial use.
Shipping Crate Inspection
1.1.1. Prior to accepting the crate(s), ensure that the crating material is similar to the pictures
shown below. Also, please verify that that there is no external damage to the wood
crate(s). If damage is found, do not accept the delivery from the shipping company.
IF
ACCEPTNG MINOR DAMAGED CRATE(S), WRITE ON ALL SHIPPING
DOCUMENTS MINOR DAMAGE FOUND ON CRATE(S).
Additionally, call Apeks at
740-809-1160 to report damage and take pictures of each damaged location.
Diaphragm Compressor Crate
Extractor Crate
Chiller Crate
1.1.2. Locate the two TiltWatch Plus sensors on the outside of the crates. Ensure that the
crates have not exceeded 30° in any direction. If the crates have exceeded 30°,
do not
accept the delivery from the shipping company
and contact Apeks at 740-809-1160
immediately.
Figure 1. Tiltwatch sensor
Содержание 2000 PSI Series
Страница 49: ...Updated 6 16 2016 Copyright Apeks LLC 2014 49 ...
Страница 50: ...Updated 6 16 2016 Copyright Apeks LLC 2014 50 Appendix C CO2 Phase Diagram ...
Страница 51: ...Updated 6 16 2016 Copyright Apeks LLC 2014 51 ...
Страница 52: ...Updated 6 16 2016 Copyright Apeks LLC 2014 52 Appendix D Training Process ...