![Apec Water RO-PERM Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/apec-water/ro-perm/ro-perm_installation-instructions-and-owners-manual_2952296011.webp)
8
Fig. 5C
5.
Needle Valve tubing connection instructions:
•
Please first slide the metal compression nut, then the plastic sleeve, and push the plastic insert all the
way into the red tubing
(See Fig. 5C)
.
•
Please push the red tubing all the way into the needle valve connection until you feel a click.
•
Please push the plastic sleeve all the way up to the needle valve connection.
•
Please screw the metal compression nut with the red tubing pushed all the way into the needle valve then
use a wrench to fully tighten this connection.
Fig. 5E
Fig. 5F
4.
Needle Valve:
See
Fig. 5D
. Screw the Needle Valve onto the Adapter tightly. Apply 6-8 rounds of
Teflon tape onto Needle Valve before attaching it to the Adapter.
To
open
needle valve:
Turn needle handle counter-clockwise.
To
close
needle valve:
Turn needle handle clockwise.
Fig. 5D
Insert
Sleeve
Compression Nut
Apply Teflon Tape Here
Push the tubing all the way into the needle valve
while tightening compression nut.