Page 11
GENERAL
INFORMA
TION
AM
ER
IC
AN
P
ILE
DRIVING E
QU
IP
M
EN
T
J&
M
F
O
UN
DAT
ION EQ
UIP
M
EN
T
MODEL 20-5 HIH
Copyright © 2022 American Piledriving Equipment Inc. All Rights Reserved
800-248-8498
800-248-8498
WWW.AMERICANPILEDRIVING.
WWW.AMERICANPILEDRIVING.
com
com
Hydraulic Impact Hammer Checklist
Impact Hammer Checklist Prior to Shipment
MUST BE COMPLETED & SIGNED PRIOR TO SHIPMENT
APE HYDRAULIC IMPACT HAMMER
INSPECTION / TEST SHEET
AM
ER
IC
A
N
P
IL
ED
RIVING EQ
UIP
M
EN
T, IN
C.
Copyright © 2022 American Piledriving Equipment Inc. All Rights Reserved
Date: ____________ Job / Sales Order No.: ______________ Equipment No.: ___________ Serial No.: _______________
HIH Model: _______________ Inspector : ___________________ Customer: __________________________________
Removed All Wire Rope for Insurances Reasons ........
Checked All Bolts on Lead Guide Rails ......................
Inspected All Wire Rope Nuts ......................................
Inspected Ram for Cracks ............................................
Inspected Lead Guide Rails and Welds for Cracks ......
Inspected all Hoses and Fittings on Cyl. Manifold ......
Checked Retainer Ring Bolts .......................................
Checked the Striker Plate .............................................
Checked Ram Connection Bolts ..................................
Removed Any Welding Attached by Customer ...........
Serial Number Stamped/Welded On ............................
Check and Cleaned Quick Disconnects .......................
Checked Caps and Plugs ..............................................
Checked O-Ring on QDs .............................................
Put Spare O-Ring Kit in Tool Box of Power Unit .......
Drive Pressure: ______________________________
Cycles Per Minute: ___________________________
Temperature Of Hydraulic Oil at Time of Test ______
LOADING EQUIPMENT CHECK LIST
Prior to the equipment going out on rent it must look like
new condition. If the paint appears bad then paint it. If the
paint surface is bad then have it sand blasted. Do not allow
the equipment to go out looking bad. Any bad hoses should
be replaced. The most important thing is the condition of the
hoses. Should be new or in new condition.
COLD WEATHER
If this unit is going to operate in cold weather then please make
sure the proper oils have been used. In cold weather operations,
we must use a softer o-ring to handle the colder temperatures.
NOTES
____________________________________________
____________________________________________
____________________________________________
____________________________________________
____________________________________________
____________________________________________
____________________________________________
____________________________________________
Inspector Signature: ________________________
Date: ________________________