3 ITEMS SUPPLIED WITH THE DETECTOR

Name

Quantity

Note

Heat detector

FT – A1
(FT – A2)
(FT –  )

Up to 100 pcs

Manual

1 pc.

Per a package

Package

1 pc.

Per 100 pcs

MUSH-2 or MUSH-3 modules can be supplied for connection with a 4-wire CP if ordered separately.

4 PLACEMENT AND INSTALLATION

4.1 You should choose places to locate detectors where there are provided:
- minimal construction vibrations;
- maximum distance from electromagnetic interferences  sources (electric wires etc.), infrared

radiation (heat devices);

- elimination of water ingress to the housing.
4.2 Place detectors taking into consideration the dimensions according to Figure 1, Figure 2.

4.3 Connect the detectors to a loop using screw joints. You can connect up to two 0.2-0.5 mm

2

 wires

to a screw joint.

4.4 Please refer to Figure 3- Figure 7 for wiring diagrams for detectors to different AL types.

   

4.5 You should provide protection against construction debris and dusts when making repair of

lodgings.

5 PREPARATION   FOR OPERATING AND SEQUENCE OF OPERATIONS

5.1 Open the package after receiving detectors, check contents.

ATTENTION! If detectors were in conditions of temperature below 0

o

C before opening the

package, allow them to acclimatize inside the structure for at least 4 hours.

5.2 Remove the detector head from the detector, rotate it anti-clockwise relative to the base.

5.3 Secure the base of the detector onto the place of installation using two self-tapping screws

20

mm

2

 (not supplied with the detector).

5.4 Connect   AL to the detector as per Figure 3 - Figure 7. Tighten screws.  Check the reliability of

the connection. Close the detector head having aligned the marks on the base and on the head. Twist the head
clockwise relative to the base as far as it will go.

5.5 Connect AL with detectors to a control panel and check alarm loop circuit.  The inbuilt indicator

shall flash for a little time on energizing.

5.6 Please refer to Figure 5 - Figure 7 for wiring diagram for the detector to 4-wire control panel. The

MUSH-2 module forms the alarm signal by current decrease or open-circuit of 4-wire loop signal line and
the MUSH-3 module – by current increase in 4-wire loop signal line of the control panel.

6 MAINTENANCE

6.1  Vacuum at least every six months to keep unit working efficiently by firstly turning off the mains

supply and vacuuming through the vents during one minute using a soft brush attachment or another
compressor.

6.2 After maintenance check detectors for proper operation.
6.3 You can check detectors directing air flow with temperature by 5°  higher than activation

threshold temperature onto the temperature element.

6.4 It is forbidden to test detectors for proper operation with the help of open fire.

7 GUARANTEE

7.1 The detector is warranted by the manufacturer for 18 months upon the date of the detector’s

commissioning  but not more than for 30 months from the date of acceptance by a representative of the quality
control service of the manufacturer.

Содержание FT-A1

Страница 1: ...ed optical indicators 1 4 The indication of Fire mode depends on the AL type the detector is connected to The indication in DC AL is made with continuous light of optical indicators and in AC AL with flashing 1 5 The detector indicates standby mode with short term flashes of the red LED 1 6 The detector is intended to operate all day long with CP by 2 wire AL with rated loop voltage 12 24V 1 7 The...

Страница 2: ...to the place of installation using two self tapping screws 20 mm2 not supplied with the detector 5 4 Connect AL to the detector as per Figure 3 Figure 7 Tighten screws Check the reliability of the connection Close the detector head having aligned the marks on the base and on the head Twist the head clockwise relative to the base as far as it will go 5 5 Connect AL with detectors to a control panel...

Страница 3: ...removed the guarantee term is prolonged for the while detectors were not in use because of faults Figure 1 APPEARANCE AND DIMENSIONS Figure 2 DESIGN AND INSTALLATION DIMENSION 1 Screw joints for AL wires connection 2 Mounting holes 3 Red LED 4 Thermal element 5 Input slots for AL conductors The numbers of contacts and places for connection of end of line and limiting resistors for DC AL housing ar...

Страница 4: ...the detector Resistors value is specified by control panel manufacturer Feasible values 24V EOL resistor 2 4 3 9 kOhm CLR 0 68 3 6 kOhm 12 V EOL resistor 1 2 2 kOhm CLR 0 1 1 5 kOhm Figure 4 WIRING DIAGRAM TO AC CONTROL PANEL Resistors values are specified by control panel manufacturer Diode VD 1N4148 ...

Страница 5: ...hm Figure 6 WIRING DIAGRAM FOR CONNECTION OF DETECTORS TO 4 WIRE DC AL THROUGH MUSH 3 MODULE EOLRAL and CLRAL from 1 to 5 kOhm are specified by control panel manufacturer CLR 680 Ohm EOL resistor 2 7 kOhm Figure 7 WIRING DIAGRAM FOR CONNECTION OF DETECTORS TO 4 WIRE AC AL THROUGH MUSH 3 MODULE EOLRAL and CLRAL from 1 to 5 kOhm are specified by control panel manufacturer CLR 680 Ohm EOL resistor 2 ...

Отзывы: