background image

Care & Maintenance

BASES and BACK WALLS: To ensure long-lasting life for your acrylic 

bases

 and 

back

 walls 

(if installed), wipe them off after each use with a soft cloth. To clean the acrylic surface, use 

non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners. 

Never use abrasive cleansers, metal brushes, or scrapers, as they can scratch or dull the 

surface.

GLASS: To ensure long-lasting life for your glass shower products, after each use rinse 

and wipe off the glass using either a soft cloth or a squeegee to prevent soap buildup 

and water spots (hard water can etch the surface of the glass over time if left to dry). 

To avoid damaging the surface, never use abrasive cleaners or cleaning products that 

contain scouring agents. Likewise, never use bristle brushes or abrasive sponges that can 

scratch the surface.

HARDWARE: To ensure a long-lasting finish, wipe off the metal parts after using with a 

soft cloth. Do not use abrasive cleaners or cleaning products containing ammonia, bleach, 

or acid. If accidentally used, rinse the surface as soon as possible to prevent damage to the 

finish (peeling or corrosion). After cleaning the polished finishes, rinse thoroughly and wipe 

dry with a soft cloth. Clean stainless steel surfaces at least once a week. When applying 

stainless steel cleaner or polish to stainless steel hardware, work with (not across) the 

grain. Never use an abrasive sponge or cloth, steel wool, or wire brush, which may 

permanently scratch the surfaces.

NOTE: Regularly inspect the glass and all hardware for misalignment, proper 

attachment, and damage. Contact ANZZI with any questions or concerns.

19

Содержание SD-AZ052-01 Series

Страница 1: ...GISTER NOW Register your product within 90 days to ensure your product is recognized as an of cial purchase and is eligible for warranty coverage Mail in the completed registry card Pg 2 or register o...

Страница 2: ......

Страница 3: ...ht of the unit Also make sure the walls are at right angles Irregular installation surface level radius corners or improper angle of side walls will result in serious problems for your installation Pl...

Страница 4: ...Drill Bit 100 Silicone Sealant Pencil Rubber Mallet Safety Glasses Stud Finder 2 INSTALLATION GUIDE BEFORE YOU BEGIN This product is heavy and may require two people to install Use cut resistant non s...

Страница 5: ...PARTS 09 x8 10 x16 ST4x35mm 1 3 8 12 x8 ST4x8mm 5 16 13 x2 14 x2 11 x16 15 x1 08 x1 01A x1 02 x1 03A x1 03B x1 04 x1 05A x1 05B x1 06 x1 07 x1 01B x1 3...

Страница 6: ...izontal Rail Bottom Horizontal Rail Magnetic Seal Water Sealing Strips Shorter Water Sealing Strips Longer Fixed Panel 1 01B 1 02 1 03A 1 03B 04 05A 05B 06 1 1 1 1 1 Part Description Qty Door Panel Ha...

Страница 7: ...72 1830mm 47 48 1190 1230mm 1 57 40mm 5 7 145mm 32 8 835mm SD AZ052 01 48 72 23 6 600mm 47 48 1190 1230mm 20 4 518mm 5...

Страница 8: ...SD AZ052 02 60 72 59 60 1495 1535mm 1 57 40mm 5 7 145mm 32 8 835mm 72 1830mm 29 6 752mm 59 60 1495 1535mm 26 4 671mm 6...

Страница 9: ...re the wall intended to hold the door has a stud at the installation point If there is no stud in the shown area we recommend employing a quali ed contractor to install one Fig 1 This manual shows lef...

Страница 10: ...r cutting to avoid risk of injury Drill a 1 4 hole at each location and insert the Anchors 09 Fig 2 2 Fig 2 3 Fig 2 5 Fig 2 6 2 Mark the drill hole locations on the wall using the predrilled holes in...

Страница 11: ...four Screws ST4x35 10 Fig 3 1 Fig 3 2 1 Step 3 2 Attach the Post 02 to the Top Horizontal Rail 03A Bottom Horizontal Rail 03B and secure with four Screws ST4x35 10 Fig 3 3 Fig 3 4 Note Make sure the...

Страница 12: ...w Caps 11 Fig 4 2 2 1 10 2 11 Attach the Wall Post R 01B to the Fixed Panel assembly NOTE The anges of Wall Post R 01B should be facing towards the wall after installation Fig 5 1 1 Step 5 Install the...

Страница 13: ...11 Fasten the Wall Post L 01B to the wall with the Screw ST4X35 10 Fig 6 1 1 Step 6 Cover the screw heads with the Screw Caps 11 Fig 6 2 2 1 2 11 10 Fig 6 01B...

Страница 14: ...d Hold the Door Panel assembly steady and drill the holes through the rst layer of the Wall Post L 01A and Wall Post R 01B into the Door Panel assembly using a 1 8 drill bit Fig 7 1 Fig 7 4 3 Secure t...

Страница 15: ...op Horizontal Rail 03A Add some lube to the roller if necessary Fig 8 1 2 Push the buttons to move the roller downward and push into the Bottom Horizontal Rail 03B Add some lube to the roller if neces...

Страница 16: ...e of Door Panel 11 through the upper hole of Door Panel 07 Hand tighten the handle lever to secure Fig 9 2 3 Connect the handle knob and one gasket to the handle from the other side of Door Panel 07 t...

Страница 17: ...te Make sure when you attach the Water Sealing Strip Shorter 05A to the Fixed Panel 06 that the ange faces inside the shower Make sure when you attach the Water Sealing Strip Longer 05B to the Door Pa...

Страница 18: ...e position of Door Panel 07 by following Step 11 2 if the magnetic seal does not fully close the door Fig 11 2 Adjust the position of upper roller by turning the screws under the roller assembly to el...

Страница 19: ...ost Cover 14 to the post Fig 12 1 Fig 12 2 2 Apply a good quality Silicone Sealant at the outer corner formed by the wall and the shower door Fig 12 Step 12 Fig 12 1 2 Hours 24 Allow 24 hours for the...

Страница 20: ...tep 3 of the right side installation instructions Then ip the Fixed Panel assembly as in step 4 and install 2 Secure the Fixed Panel assembly as in step 5 3 Before installing the Door Panel 07 as in s...

Страница 21: ...products that contain scouring agents Likewise never use bristle brushes or abrasive sponges that can scratch the surface HARDWARE To ensure a long lasting nish wipe o the metal parts after using wit...

Страница 22: ......

Отзывы: