background image

Step 1     Faucet installation

Hot

Cold

2

1

3

1.
2.Secure the faucet with fixing kit and tighten the lock nut with allen wrench.

Position the faucet with o-ring on the installation surface.

3.
   wrench. 

DON'T OVER TIGHTEN! 

Caution: make sure connect the hot and cold flexible hose to supply valves 

   correctly. 

Connect the flexible hoses to water supply valve (not included) and copper tubes, and tighten it with adjustable 

Warning:
The supply valves are not included, please purchase them in plumb shop.

Step 2     Checking and testing

Step 3     Cleaning and care

Daily cleaning and care are required in order to keep the product shining and 
properly working.

 

1

2

3

4

Clean it with water and dry it with soft cloth.

Clean the product with gentle liquid or glass cleaner. 

Don't use acid cleaner. 

Don't clean with abrasive material, abrasive paper or knife.

2

1

1.Remove the aerator by 

. Turn the faucet handle all the way on, turn on hot and cold water supply and flush water 

   lines for one minute. Reinstall aerator by hand.
2.Check all connections at arrows for leaks, re-tighten it if necessary. 

BUT DON'T OVERTIGHTEN!

hand

Отзывы: