Antaira Industrial Ethernet Switches
LNP-1002G-SFP-24 Series User Manual V1.0
10
2.7 Wiring the Power Inputs
Please follow below steps to insert the power wire.
1. Insert the positive and negative wires into the PWR1 (V1+, V1-) and PWR2 (V2+, V2-)
contacts on the terminal block connector as shown below in
Figure 2.14
.
2. Tighten the wire-clamp screws to prevent the wires from loosening, as shown below in
Figure
2.15
.
Note
Only use copper conductors,
60/75
°
C
, tighten to
5 lbs.
The wire gauge for the terminal block should range between
18~20 AWG
.
Figure 2.15
Power Terminal Block
Figure 2.14
Power Terminal Block