Antaira Technologies - Industrial Ethernet Switches
LMX-2828G-10G-SFP Hardware Manual V1.0
8
2. Push down the metal clasp and pull the transceiver out by the plastic part as shown below in
Figure 2.9
.
2.7 Connecting the Power Input
Please follow the below steps to power on the switch.
1. Connect one
side of the switch’s power cable with the switch’s AC power port as shown
below in
Figure 2.10
.
2. T
urn on the power and check to see if the switch’s AC power LED is on. If the power LED is
on, that means the power is connected correctly.
Grounding Note
Grounding and wire routing help limit the effects of noise due to Electromagnetic Interference (EMI).
Run the ground connection from the ground screw to the grounding surface prior to connecting
devices.
*NOTE:
Using a shielded cable achieves better electromagnetic compatibility.
Figure 2.9 - Pull Out from the SFP Module
Figure 2.10
– Connect Power Cable