background image

Safety recommendations for handling and lifting 

Before starting the operations, organise the intended working area so that the materials can be lifted 

and handled in safety. 

Unloading, loading, handling and lifting operations must be carried out by skilled, authorised, specifi­

cally trained staff. 

During lifting and handling operations, the people not involved in the operations must remain at a safe 
distance. 

For lifting, use hooks and ropes which are free from damage and appropriate for the load to be lifted. 

Packaging description and unpacking 

The packaging normally consists of a cardboard box for easy, safe transport. 

Depending on the quantity of goods to be shipped and the place of destination, packages may be fixed on a 

pallet for easier lifting and handling. 

Check the weight of the item on the transport documents to allow the use of suitable lifting equipment. 

When unpacking, check that all components are present and intact.  If items are missing or damaged, contact 

the dealer or manufacturer to agree the p

r

ocedu

r

es to be followed. 

The packaging material must be disposed of appropriately in accordance with the relevant statutory require­

ments. 

Transport 

The pump may be shipped by a variety of means of transport (road, rail, sea or air) depending on its destination. 
Secure the packaging firmly to the vehicle during transport, to prevent random movement. 

Storage 

In the event of a lengthy period out of use, place the pump (in its packaging if possible, or otherwise protected) 

under cover, protected from the weather. 

Do not store in places where the ambient conditions might impair the pump's operating condition over time. 

Safety recommendations for installation 

Take all possible precautions to allow the pump to be installed in a safe, risk-free manner. 

All installation phases must be taken into consideration when designing the machinery or plant in which the 

pump is to be installed. 

The design must consider all mounting points, the means of transmission of the energy sources, and the pro­

tective and safety devices required by the relevant regulations to prevent the risk of injury. 

Содержание AR 115 bp

Страница 1: ...7 9 290 20 5 5 44 0 AR135BP C 33 8 128 0 290 20 6 8 34 2 AR135BP SP 33 8 128 0 290 20 6 8 34 2 AR135BP GR3 4 33 8 128 0 290 20 6 8 44 0 AR135BP GR1 33 8 128 0 290 20 6 8 44 0 AR115BP C1000 24 8 94 0 2...

Страница 2: ...35 For Models AR70 AR115 AR135 AR1671 AR31185 For Models AR45 AR60 AR80 Shaft Kit AR43392 1 3 8 Male Spline Shaft Gearbox Kit 3 4 for 5 6 HP Gas Engine Shaft Kit AR43389 1 Male Solid Keyed Shaft For m...

Страница 3: ...BP 140 F Max Temperature 1 Inlet 1 Return 1 2 Outlet 3 ucm 3 Remote control unit with working pressure regulating valve opening closing control lever anti drip and glycerin filled pressure gauge with...

Страница 4: ...o not draw in liquids at temperatures above 50 C or below 5 C Do not use the pump in drinking water supply systems Do not use the pump on products for human consumption Do not use the pump on pharmace...

Страница 5: ...diagram guideline The following is a simplified illustration of the typical installation layout and is purely a guideline Control Unit by pass Control Unit Delivery line filter Tank Agitation Pump In...

Страница 6: ...see Technical Data free from restrictions and elbows and with a filter of suitable capacity see Installation For occasional duty such as filling water supply tanks the pump can be operated at a vacuum...

Страница 7: ...issing ordamaged contact the dealer or manufacturer to agree the procedures to be followed The packaging material must be disposed of appropriately in accordance with the relevant statutory require me...

Страница 8: ...g a vacuum gauge to the pump intake fitting The rated pressure of the outlet hose fittings and clamps must be no less than the maximum rated pressure ofthe pump Replacing the intake and outlet fitting...

Страница 9: ...nk oil level as described in the Checking the oil level section Before putting the pump into operation check that the control unit is set for low pressure Starting and stopping the pump To start the p...

Страница 10: ...rtridge See Inspecting the filter Pump Checking the oil level See Checking the oil level Connection of pump to power Inspection Every working day source pulley belt coupling Pump Inspect mounting See...

Страница 11: ...placed Inspecting the Inlet Filter Inspect the inlet filter cartridge If the cartridge is fouled wash it thoroughly to remove the dirt If the cartridge is torn or cracked it must be replaced Checking...

Страница 12: ...he pump of products which are often corrosive and may damage its wetted parts over the long term If thepump is instorageduring the winter in locations with severe weather conditions it is very importa...

Страница 13: ...Restriction in intake circuit Intake filter fouled Intakecircuit not airtight Residual air left inside pump Valve plate stuck to its seat Pressure accumulator deflated Pressure accumulator deflated R...

Страница 14: ...t worn Oil pressure inside pump too high Restore correct oil level in tank One or more diaphragms ruptured Stop the pump at once Replace the diaphragms 1 Oil on pump body or base Pumpusing too much oi...

Страница 15: ...2021 AR North America 24 4 A R NORTH AMERICA A R NORTH AMERICA AR 115 bp AR 135 bp AR 115 bp 1000 rpm Attention Assemble with grease between the plate and the membrane Version SP Version C 2154700 Air...

Страница 16: ...nnecting rod 2 37 551040 Bolt TE M10x55 12 Geomet 38 550310 Bushing 1 46 550340 Fitting 1 G M M 1 47 550350 O ring 23 81x2 62 1 48 550242 Ring nut 1 G 1 49 550370 Elbow 1 1 50 540550 Elbow 1 1 2 1 Pos...

Страница 17: ...t 1 13 550930 Gear Z 64 1 14 621000 Cover 1 15 180030 Bolt TCEI M8x20 1 T220 T220 16 550950 Bolt TSEI 10x25 3 T180 T180 17 620561 O ring 78x2 5 1 18 550920 Flange 1 19 580230 O ring 69 52x2 62 1 20 62...

Отзывы: