5
The next step after the valve bases have been installed is to install the two 10mm hex
standoffs in the center of the underside of the chassis as shown in the above pic – this
is the mounting for the tag strip that we will install later for all the hardwiring! Use the 2
x M3 10mm hex standoffs and 2 M3 6mm countersunk screws that screw in from the
top side of the chassis!
Содержание Kit1 300B
Страница 10: ...9 Tang strips installed ...
Страница 14: ...13 Wire the first set through the grommet Position the wires in the other grommet ...
Страница 23: ...22 Now thread the wires through the grommets as shown above and below ...
Страница 28: ...300B Hardwiring Section 1K8 Resistors 220uf CAPS 1K Grid resistors A B C D E F G H I J K L M N ...