24
This is the position that we will be working on now for the rest of the kit basically! All the
transformers are installed and we can start working on the circuit boards , hardwiring of
the 300B section , the filament board and the IEC rocker section – Let start with the IEC
rocker section where we will use the primary windings of the Mains transformer!
Содержание Kit1 300B
Страница 10: ...9 Tang strips installed ...
Страница 14: ...13 Wire the first set through the grommet Position the wires in the other grommet ...
Страница 23: ...22 Now thread the wires through the grommets as shown above and below ...
Страница 28: ...300B Hardwiring Section 1K8 Resistors 220uf CAPS 1K Grid resistors A B C D E F G H I J K L M N ...