background image

GPC-14/18 
PASTA COOKER 

SHIPPING CONTAINER INSPECTION 

1. 

Carefully examine the shipping container for external damage. If damage is noted, notify the delivery carrier immediately. Save all packaging 

materials for claim examination. 

2. 

If no external damage is noted, remove the unit from the shipping container and carefully examine it for damage. If damage is noted, place the 

unit in a safe location so that it can be inspected. 

 

SPECIFICATIONS 

 
 
 
 

* Measured at pressure tap on burner manifold. 
† Measured at appliance input when all other gas powered equipment is operating. 
‡ IN. W.C. = Inches, Water Column 

 

A  115 Volt 3-pronged grounded plug is supplied with all gas units. 

Refer to the inside door of the unit for the appliance wiring diagram. 

 

LEG / CASTER INSTALLATION 

1. 

Carefully lay cooker on its back and install legs or casters as shown in diagram 

A

 below. 

2. 

After placing unit in installation area, adjust individual leg inserts to level cooker (so unit does not rock), by turning only the individual inserts. 

 

Note: Appliances with casters must be secured with a restraining device to limit movement; refer to diagram B below. 
 
 
 
 
 
 
 
 
 
 
 
 
 

Set the length of the restraining cable so 

that the gas connector is not kinked when 

the restraining device is fully extended. 

 
 

Diagram 

Diagram 

Diagram 

 
 
 
 
 
 
 

 

 

 

A minimum 6-inch clearance is 
required between the unit and the 
site wall(s.) 

MODEL

INPUT

 

BTU/H

 

NATURAL

 

PROPANE

 

NATURAL

 

PROPANE

GPC

14

111,000

GPC

18

160,000

 

/

 

80,000

 

MANIFOLD

 

PRESSURE*

 

SUPPLY

 

PRESSURE†

  

ELECTRICAL

 

REQUIREMENTS

3

1/2

 

IN.

 

W.C.‡

10

 

IN.

 

W.C.

 

MINIMUM

 

6

 

IN.

 

W.C.

MINIMUM

 

11

 

IN.

 

W.C.

120V, 50/60Hz SINGLE PHASE 

Содержание PASTA PRO GPC-14

Страница 1: ...nformation must be posted in a prominent location WARNING Improper installation adjustment alteration service or maintenance can cause property damage injury or death Read the installation operating a...

Страница 2: ...the unit for the appliance wiring diagram LEG CASTER INSTALLATION 1 Carefully lay cooker on its back and install legs or casters as shown in diagram A below 2 After placing unit in installation area a...

Страница 3: ...t be obstructed The bottom and back of the unit must be kept open so that the burners will be able to draw enough air for proper operation The area directly in front of the unit must be kept open so t...

Страница 4: ...Pilot must be turned off if cook tank is empty POWER BURST 18 and 20 Pasta Cookers are equipped with the Power Burst System The Power Burst toggle switch is located on the front of the unit Hard Boil...

Страница 5: ...eck the burner tube baffles located inside the burner tube on 18 20 tube fired models to ensure that they are not deteriorated beyond their useful life If baffles need to be replaced contact the facto...

Страница 6: ...under LIGHTING AND SHUT DOWN section If the pilot is burning turn the knob to the ON position Turn the thermostat knob to a higher set point Check incoming gas pressure If the pilot is burning the sa...

Страница 7: ...wire and NO right motor blue left motor brown If the motor operates the timer has failed and must be replaced If the motor does not operate the microswitch or motor may have failed Set a time value us...

Страница 8: ......

Страница 9: ...NOTES...

Страница 10: ...please contact the Anets your equipment please contact the Anets factory at Authorized Service and Parts representative 603 225 6684 World Wide ASAP covering your area or contact Anets Website Address...

Отзывы: