AE04B-A0279 Rev -- APPENDIXA: AMPLIFIER INSTALLATION
Document use is restricted to that described on cover
A-5
1. Find appropriate location for Repeater Installation
2. Install the repeater to a pole using mounting kit
3. Material used from mounting kit.
a. Mounting Unistrut (Qty – 2ea)
b. Floating Nut (Qty – 4ea)
c. Clamp (Qty – 2ea)
d. Stainless steel Band Strap (Qty – 2ea)
e. Mounting Bracket (Qty – 4ea)
f. X .75 Hex Head Screw (Qty – 4ea)
g. Washer, 3/8 approximately (Qty – 4 ea)
4. Mount Amplifier to Unistruts
5. Install the floating nuts from the mounting kit into the mounting unistrut.
6. Use the 3/8 approximately hardware supplied with the mounting kit to install the
amplifier to the mounting unistrut.
6. Power Up
1. Use the power Cable (AE02C-D3300-001) to connect the amplifier to a power
source.
2. The amplifier will accept from 90 – 260 VAC @ 240 Watts
3. If the connector on the cable is not compatible with that of the power source, you
may either:
a) Find an appropriate adapter.
b) Locate the correct connector and splice the cable. The wiring follows North
American standards
•
Black Wire – Line
•
White Wire – Neutral
•
Green or Green/Yellow Wire – Ground or Earth
7. Alignment and Test
This procedure will allow the installation crew to properly align and test the repeater
system. This procedure assumes the antennas and cables are properly aligned and
operating correctly.
1. Connect a spectrum analyzer to the donor antenna cable. Adjust the analyzer for a
convenient display of the BTS signal, and record the received signal level.
Received Signal Level __________dBm