background image

Install drain line

•  Secure 7/8" drain line with the hose clamp provided. 

Do not over tighten.

•  Make sure drain line has a constant downward slope and is not kinked or blocked.

•  If floor drain is not available, use condensate pump to route water to a drain.

NOTE:

 The humidifier uses cold water to temper drain water to less than 140°F.

Water quality and 

canister selection

The Steam Humidifier operates on water with conductivity between  
75 and 1,250 EC.

•  Connect to water supply. 

Do not use RO or DI water.

•  Use cold water only.

WATER QUALITY GUIDELINES 

EC (1:1) 

Research

Grains/

Gal

Hardness

Recommended Canister by Voltage

120VAC

208VAC

240VAC

75-100

0-3

Naturally 

Soft

Installation Not 

Recommended

AS80LC

AS80LC

100-300

3-9

Naturally 

Soft

AS80LC

AS80LC

AS80LC

300-500

9-15

Slightly 

Hard

AS80LC

AS80

AS80

500-650

15-20

Moderately 

Hard

AS80LC

AS80

AS80

650-850

20-25

Hard

AS80LC

AS80

AS80

850-1250

25-36

Very Hard

AS80LC

AS80

AS80

above 

1250

above 

36

Extremely 

Hard

Installation Not Recommended

Softened

AS80

AS80

AS80

4

5

6

FACTORY SETTING FOR 

11.5 AMP NOMINAL OPERATION

RECOMMENDED SETTING

SLIDE DIP SWITCH #1 TO 

“ON” POSITION FOR 16.0 AMP 

NOMINAL OPERATION

120

LED D8

208

240

120

208

240

Capacity

Settings are chosen based on desired capacity.

STEAM CAPACITY

Amperage

Voltage

Maximum 

Steam Capacity 

(gal/day)

11.5

120V

11.5

208V

20.5

240V

23.3

16.0 

(Nominal)

120V

16.0

208V 

(recommended)

30.0

240V 

(recommended)

34.6

Circuit board dip switches

For max capacity connect to 240V and set dip 
switch from 11.5 to 16 Amps.

90-1959

2

Отзывы: