![Anco Equipment Batch Pasteurizer Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/anco-equipment/batch-pasteurizer/batch-pasteurizer_manual_2941164032.webp)
VAT PASTEURIZATION – CRITICAL CONTROL POINTS
1. Time and temperature requirements
2. No temperature abuse
3. Covers in place during operation
4. Vat construction within compliance
5. Agitation during operation
6. No ingredients added after pasteurization
7. Product protected after pasteurization
INDICATING AND RECORDING THERMOMETERS
VAT PASTEURIZER THERMOMETER CRITERIA
PASTEURIZATION GREATER THAN 160°F
9/25/2018
32
Содержание Batch Pasteurizer
Страница 16: ...9 25 2018 16 Figure 1 Figure 2...
Страница 19: ...Ground To be installed by a licensed electrician 19 Anco Electric Air Space Heater...
Страница 20: ...Anco Airspace Heater Element 20...
Страница 23: ...9 25 2018 23 Spray Ball Installation and Maintenance...
Страница 24: ...9 25 2018 24 Spray Ball Specification Sheet...