Step 5

Attach the 

fi

 rst hip.  Lift the Peak end of the hip up by climb-

ing a ladder (ladder placed at the approximate position of 
the peak) (See Figure 5).  Another person at the upright on a 
ladder must direct the person at the peak end of the hip so 
that it may be slipped into place on the upright.  Make sure 
the holes in the upright are aligned with those in the hip.  
(See Figure 3)  Loosely install bolt at hip to upright.

Step 6

Attach the Peak weldment to the hip. (Figure 6) 
Warning:  Examine the orientation of the peak weldment so 
that the angles of the hips and ridge look to be pointing in 
the proper directions.
Do not insert the bolt until later.  For safety reasons, have 
the person at the peak stay at that position until all hips are 
installed.

Step 7

Erect the second upright at Corner BB.  The second upright 
must be oriented as shown in Base Plate Layout and Figure 
2. 
Warning:  Again examine the orientation of the upright so 
that when hip is attached it will be pointed toward the ridge.  
(See Figure 3)
Fasten the base plate to the anchors but with only a loose 

fi

 t 

at this time for aid in installation.

Step 8

Lift the peak end of the second hip up and place on the peak 
weldment.  Do not insert the bolt until later.  (See Figure 7)
  

Step 9

It may be necessary to lean or tip the upright to align it so 
that the hip can be slipped over the top of the upright. Once 
the hip is on the upright, check to be sure that the holes in 
the hip line up with the holes in the upright.  If they do not 
align, your upright may be turned incorrectly.
Loosely install bolt at hip to upright.
Tighten the base plate anchors to snug.

Step 10

Bolt the ridge tube to the peak weldment.  Bolt the other 
peak weldment to the other end of the ridge tube.  (See 
Figure 8)  

 

Step 11

Erect the third and fourth uprights (corners CC and DD). 
Follow the instructions from Step 7 thru Step 9.

 

Step 12

Insert bolts for peak weldment into remaining hips.  Tighten 
all base plate bolts and tighten the bolts and nuts from the 
hips to the uprights at this time.

The Frame portion of the Perfect Shade is complete.

Figure 8

Ridge

Figure 5

Peak

Figure 6

Figure 7

Peak

Hips

Hip

Hip

Peak

Peak

Note:  12’ ladder used 
at peak for 20’ frame.  
Shorter ladder may 
be used on smaller 
frames

5

Содержание Perfectshade

Страница 1: ...ns PS 1014 PRODUCTION FACILITIES EVANSVILLE IN PHONE 800 322 8368 or 812 867 2421 FAX 812 867 4636 EMAIL custdiv anchorinc com www anchorinc com SALES OFFICES 7701 HIGHWAY 41 N EVANSVILLE IN 47725 USA EC 4829 Perfectshade ...

Страница 2: ...bundle of fabric 4 When moving frame sections by hand use proper lifting techniques to protect the back and avoid pinching fingers while making hardware connections 5 Do not drag bundle of fabric on concrete asphalt or ground as this can cause damage to the fabric from abra sion through the bag 6 The installation method described here requires coordination of tasks between workers A safe installat...

Страница 3: ...tes un less noted otherwise NOTE The installer is solely responsible for determining the proper anchoring device DIMENSION CHART FOR BASE PLATE LAYOUT Size A B C D E 10 x 10 9 10 9 10 10 8 1 2 10 8 1 2 13 10 7 8 10 x 15 14 10 9 10 15 8 1 2 10 8 1 2 17 9 9 16 10 x 20 19 10 9 10 20 8 1 2 10 8 1 2 22 1 5 8 15 x 15 14 10 14 10 15 8 1 2 15 8 1 2 20 11 3 4 20 x 20 19 10 19 10 20 8 1 2 20 8 1 2 28 0 9 16...

Страница 4: ...gure 4 Remove template before base plate installation Corner BB 1st Base Plate Template Corner AA 2nd Base Plate Template taped to concrete surface Ridge Figure 2 Corner CC Base Plate Template Corner DD Base Plate Template Upright Slide hip down over upright align ing holes Figure 3 Note that hole thru top of upright is perpendicular to hip and aligns with hole in hip Upright Hip Peak Weldments No...

Страница 5: ...he base plate to the anchors but with only a loose fit at this time for aid in installation Step 8 Lift the peak end of the second hip up and place on the peak weldment Do not insert the bolt until later See Figure 7 Step 9 It may be necessary to lean or tip the upright to align it so that the hip can be slipped over the top of the upright Once the hip is on the upright check to be sure that the h...

Страница 6: ...irst cor ner Using short bursts pull the fabric down over the corner using the web handles and attach as in Step 15 See Figure 11 Step 17 Proceed to the corner opposite the wire rope attachment corner Using the same technique as on Step 16 attach this corner Step 18 Proceed to the last corner The wire rope attachment corner See Figure 12 Slide a pull rope from the instal lation kit sold separately...

Страница 7: ...tic bag or in the installation kit sold separately Using a pair of vice grips if available clamp or hold the two cables together on one side Examine each side to see which side is most acces sible Figure 15 Fasten one of the cable clamps onto the cables and tighten Fas ten a second cable clamp right beside the first one and tighten Figure 16 Step 22 Now loosen the tension on each of the come a lon...

Страница 8: ... gravel to bottom of holes Bottom of pole must be allowed to drain water Frame may be assembled with uprights in holes See steps 5 through 12 for frame assembly When frame is assembled plumb and level frame and brace into position Fill concrete to ground level Allow concrete to dry 72 hours before installing fabric See steps 13 through 22 Note Concrete and gravel for setting uprights for embedded ...

Страница 9: ...n provided in the installation instructions is not a suggestion about what is necessary to meet a site speci c load For additional important information consult The IFAI Procedural Handbook For the Safe Installation and Maintenance of Tentage and the IFAI Pocket Guide Pullout Capacity of Tent Stakes both available from the IFAI Tent Rental Division or on our website 3 Inasmuch as the weather is un...

Отзывы: