Installation and commissioning
23
4
Installation and commissioning
The specific requirements regarding the ambient conditions of the installation site and
the space requirements for the real-time PCR thermal cycler, as well as for the power
module, can be found in “Technical data” on page 39 ff.
Consideration must be given to the following when installing the qTOWER
3
auto:
Place the real-time PCR thermal cycler and the power module on a dry and sturdy
surface. The surface must be heat-resistant and acid-proof.
The device should not be installed in the immediate vicinity of sources of electro-
magnetic interference.
Keep the device out of direct sunlight.
Protect the device against wet and damp conditions, as well as condensation.
Place the device at a minimum distance of 15 cm between the rear of the device and
the wall or other objects. A minimum distance of 10 cm should be maintained on
both sides. Ensure that the ventilation slits are clear. Insufficient ventilation may
cause the device to overheat.
Take into consideration the space required for the control PC (also monitor and
printer, where applicable)
4.1
Power supply
WARNING
Observe the mains connection!
Only connect the qTOWER³ auto to a properly grounded power outlet in accordance with
the voltage specifications on the type plate.
The qTOWER³ auto is operated with single-phase alternating current.
Prior to commissioning, please make sure that the operating voltage is the same as the
mains voltage.
The device may only be used with the power cable supplied or a power cable with the
same specification. The use of other power cables is not permitted.
Environmental conditions
Requirements with regard
to the installation location