Installation and start-up
36
Edition 01/2014
contrAA 600
6
Installation and start-up
PREVENT ANY UNAUTHORIZED INTERFERENCE!
The device may only be assembled, installed and repaired by the service engineers from
Analytik Jena AG or by technical personnel authorized by Analytik Jena AG.
Any unauthorized interference limits warranty entitlements. When installing and starting up
your machine, please observe the safety instructions in Section "Safety instructions" p. 6.
Compliance with these safety instructions is a requirement for error free installation and the
proper functioning of your AAS measuring environment. Always observe all warnings and
attention messages which are displayed on the device itself or which are displayed by the
control program of the contrAA 600.
For error-free operation of the contrAA 600, please ensure that the user instructions de-
scribed in Chapter "Installation conditions" p. 18 are always complied with. If the con-
trAA 600 has to be moved, please follow the instructions in Chapter "Transporting the
contrAA 600" p. 74.
6.1
Supply and control connections
The supply lines are connected during the assembly of the contrAA 600 by service engineers
from Analytik Jena AG.
The mains switch is located on the right side of the contrAA 600. The right side also has
easily accessible connections for PC and accessories. The media connections for gas and
electricity as well as the fuses are located at the rear.
A pair of carrying rods are fastened to the left and right for transport and assembly. After
assembly the bars are unscrewed and the openings sealed with the stoppers supplied.
1
Connection strip
2
Media connections for gas
3
Carrying rod
4
Mains switch
5
Carrying rod
Fig. 17
Mains switch and bar for supply and control connections on the right side of the
contrAA 600