ADM & Sub Aspida
User Manual
Int. Approved
Document ref: PSA-811-22
March 2020
Page 10 of 45
Copyright © 2017 Analox Ltd. All Rights Reserved.
Commercial in Confidence
4
Installation
4.1
Installation of the Sub Aspida
Before using the Analox Sub Aspida, batteries should be inserted into the instrument. If using the
rechargeable batteries provided, it should be given a full charge cycle. A full charge cycle will be
complete within approximately 4.5 hours.
4.2
Installation of the ADM Aspida (Using faceplate kit)
The ADM Aspida will come with the battery cover secured to the main unit.
An optional ADM Aspida faceplate kit is available to purchase separately from Analox, see section
7.1 for details.
Details on how to fit the faceplate are provided with the kit.
If using the faceplate kit, the cut-out required for the ADM Aspida with faceplate is shown below.
Optional fixing kits are available from Analox, see spares and accessories list at section 7.1
To install the ADM Aspida into your panel, place the captive nuts from the fixing kit through each
of the 10mm diameter holes in the panel, then while securing the captive nuts screw in the M5 x
25mm Pozi Pan screws from the fixing kit until the captive nut comes back on itself.
Содержание ADM Aspida
Страница 2: ......