background image

Evaluation Board User Guide 

UG-127 

 

Rev. A | Page 5 of 8 

ORDERING INFORMATION 

BILL OF MATERIALS 

Table 1.  

Quantity 

Reference Designator 

Description 

Package 

+VS, −VS, GND1, GND2, GND3, GND4, TP1 

Test point 

TP1 

C1, C4 

10 µF capacitor 

C3528 

C2, C5, C6 

User-defined capacitor 

C1206 

DIS 

SMA_HD 

SMACON 

DUT 

5-Lead SOT-23 or 6-lead SOT-23 

SOT-23-5 or SOT-23-6 

IN+, IN−, OUT 

SMA/SMT 

SMA/SMT 

R1 to R9 

User-defined resistor 

R1206 

 
 
 

Содержание UG-127

Страница 1: ...an SMA connector for the disable pin The ground plane component placement and supply bypassing are laid out to minimize parasitic inductances and capacitances The evaluation board components are prima...

Страница 2: ...erns 4 Ordering Information 5 Bill of Materials 5 REVISION HISTORY 5 11 Rev 0 to Rev A Changes to User Guide Title General Description Section Figure 1 Caption and Figure 2 Caption 1 Changed Evaluatio...

Страница 3: ...ER DEFINED AGND AGND AGND AGND AGND C5 C6 C2 VS GND4 GND3 GND2 GND1 DIS AGND AGND AGND AGND AGND IN IN TP1 VOUT 6 5 4 3 2 1 DUT VOUT VS DIS VS SOT23_6 R2 VOUT R5 R3 R4 VS VS OUT R8 R7 R1 R6 R9 VS VS V...

Страница 4: ...BOARD ASSEMBLY DRAWINGS AND LAYOUT PATTERNS 08981 004 Figure 4 Board Assembly Drawing Component Side 08981 006 Figure 5 Board Layout Pattern Component Side 08981 005 Figure 6 Board Assembly Drawing Ci...

Страница 5: ...ity Reference Designator Description Package 7 VS VS GND1 GND2 GND3 GND4 TP1 Test point TP1 2 C1 C4 10 F capacitor C3528 3 C2 C5 C6 User defined capacitor C1206 1 DIS SMA_HD SMACON 1 DUT 5 Lead SOT 23...

Страница 6: ...UG 127 Evaluation Board User Guide Rev A Page 6 of 8 NOTES...

Страница 7: ...Evaluation Board User Guide UG 127 Rev A Page 7 of 8 NOTES...

Страница 8: ...other party for any reason Upon discontinuation of use of the Evaluation Board or termination of this Agreement Customer agrees to promptly return the Evaluation Board to ADI ADDITIONAL RESTRICTIONS C...

Отзывы: