TESTING THE INSTALLATIONS
PAGE 10
AMPERES AX3700
POWER UP
With all cablings for input outgoing audio source, amplifier input and output channels connected, switch on the
power to the unit. Please use regulated 24V DC with min 0.5A rating. Unregulated power supply may cause fault
to the unit.
Once the power is on, all channels shall be at faulty position, and PT shall be sent to every individual channel. It
shall take approximately 30 seconds for the system to normalise. Remember all amplifiers shall be switched on
too.
TEST INDIVIDUAL WORKING FUNCTION
Switch off the power of the amplifier at
Channel 1.
Normal LED at ch.1 shall off, Fault LED shall lit and
followed by the takeover LED. Buzzer shall be activated.
This action shall take a maximum time of 25 seconds.
Switch on the power of the amplifier 1.
The channel shall return to normal mode with Normal
LED on, Fault and Takeover LEDs OFF as well as buzzer
being silenced.
TEST PARAMETER
OBSERVATIONS
TEST PRIORITY WORKING FUNCTION
Switch off the power of the amplifier at
Channel 1.
Normal LED at ch.1 shall off, Fault LED shall lit and
followed by the takeover LED. Buzzer shall be activated.
This action shall take a maximum time of 25 seconds.
Switch off the power of the amplifier at
Channel 2.
At Ch.1, Fault LED shall remain lit while Takeover LED
shall be off.
At Ch.2, Normal LED off, Fault LED on and Takeover LED
shall lit.
TEST PARAMETER
OBSERVATIONS
Repeat the above steps for Channel 2 to 6
With amps at Ch1 and 2 still off, switch off
the amp at Ch3.
At Ch.1,2, Fault LED shall remain lit while Takeover LED
shall be off.
At Ch.3, Normal LED off, Fault LED on and Takeover LED
shall lit.
Repeat the above steps with Ch4 switched off while the previous ones still at OFF position. You shall observe the
same pattern at the indicators in sequence.
After channel 6, switch on the power amp in sequence from Ch6 to 1 and the observations shall be as opposite
to the earlier procedures.