  NZ100 Installation Commissioning & Operation 

 

Page 11 

 

7. 

INSTALLING THE BRIGADE BOARD (SGD type II ) 

 

The Brigade Board interfaces to a Line Transmitter to facilitate monitoring by a Fire Brigade or 
monitoring service. It can be supplied installed or in fast fit kit form which contains all the necessary 
parts for installation. Fitting the board is a simple procedure as detailed and illustrated below. 
 
1. 

Turn off power and disconnect the battery. 

 
2. 

Fit door switch bracket assembly to top right corner of cabinet with M3 screws supplied. 

 
2. 

Fit four nylon standoffs onto 302 - 665B. 

 
4. 

Remove the jumper link from CN3 and fit the six-way cable. 

 
5. 

Remove the left bottom screw of 302 - 665B and install the earth cable as shown below. 

 
6. 

Fit 302 - 678 onto nylon standoffs as shown below. 

 
6. 

Connect the six-way cable to CN2 of 302 - 678 and the two-way cable to CN1. 

 
8. 

Terminate Line Transmitter ( LTX ) cables to 302 - 678. 

 
9. 

Set the K1 links to the assigned address. 

 
10. 

Switch power on to NZ100 and connect battery. 

 

11.

 

Test the monitoring in accordance with the LTX SDG Input Interface Specifications. 

 

Note:

 

When the SGD is ordered with the panel, the SGD will be fitted and programmed prior to delivery. 

 

Fit 25mm nylon
standoffs into 
302 665B board.
Then fit 302 678 
board to standoffs.

Fit door switch bracket
with M3 screws.

Fit 6 way cable from CN3 of the
302 - 665B to CN2 302 - 6780

Fit 2 Way cable to door switch.

Fit earth wire
from 302 678
to under screw
of 302 665B.

3A

F 1

0V

F3

0 . 8 A

F 2

C14

TB2

BZ1

D6

SW1

SW2

SW3

CN1

BELL

+

-

-

+

-

WALK
T E S T

BUZZER

MUTE

NORMAL

BELL

SYS.

Z O N E

BATT.

+

AUX

1
2

SECONDARY FUSE

BELL BATT

MAINS ON

15V A.C.

302 665B

BELL

D E T

RESET

+

AMPAC

SGD

Type

II

A

+

-

B

NORMAL

NORMAL

ISOLATE

T E S T

NORMAL

F I R E

DEFECT

ISOLATE

POLL

D O O R

SWITCH

302 678

U7

+

BZ1

C N 1

U3

U4

TB1

U2

R12

U6

U5

SW2

SW1

Cable
to LTX
Interface
& 12 volt
Supply

+

C N 2

F I R E

SYSTEM

K2

K1

F 1

250mA

S D G

ADDRESS

All Links
Off = 16

1
2
3
4

 

Содержание NZ100 Series

Страница 1: ...C Co o on n nt t tr r ro o ol l l P P Pa a an n ne e el l l N N NZ Z ZS S S4 4 45 5 51 1 12 2 2 2 2 20 0 00 0 03 3 3 Our aim is to provide Consistently Excellent Service in the eyes of our customers INSTALLATION COMMISSIONING OPERATION FIRE DEFECT NORMAL FIRE ALARM PANEL NZ100 SILENCE ALARMS BIGADE USE ONLY EVACUATION AMPAC ...

Страница 2: ...NZ100 Installation Commissioning Operation Page 1 ...

Страница 3: ...zzer 4 3 9 Buzzer Mute 4 3 10 Defect Indicators 4 3 11 Power Supply 5 3 12 Mains On Indicator 5 3 13 Fusing 5 3 14 Batteries 5 4 CONNECTING DEVICES 6 4 1 Detectors 6 4 2 Detector Limitations 6 4 3 Manual Call Points 6 4 4 Bells and Sounders 8 4 5 Auxiliary Relay 8 5 SETTINGS 9 5 1 Gating 9 5 2 No Brigade Board 9 6 INSTALLATION AND INITIAL OPERATION 10 6 1 Installing the NZ100 10 6 2 Initial operat...

Страница 4: ......

Страница 5: ... you are correctly earthed 2 SPECIFICATIONS Size 220mmH x 290mmW x 80mmD 2 1 Power Supply Battery Charger Mains Supply 230V AC 10 0 5A Charger Output Voltage 13 5V DC Output Current 0 5A Battery one of only 12V 7AH System Quiescent Current 22mA After 10 minutes battery operation 2 2 Outputs Bell Circuits 2 total Voltage 12V DC Maximum current 3A max for both circuits End of line resistor 10kOhm 1 ...

Страница 6: ...gure 1 Front Panel Layout MODEL S No REG No TESTED BY DATE NZ100 AC 102 LINK SETTINGS LINK K1 1 SMOKE ONLY K1 2 GATING FUSE RATINGS FUSE MAINS TERMINATON BELL F1 BATTERY F2 SECONDARY AC F3 FITTED SMOKE DETECTORS ONLY GATING ON NOT FITTED MIXED ZONE MANUAL CALL POINTS HEAT DETECTORS AND SMOKE DETECTORS GATING OFF RATING AND TYPE 0 5A M205 3A M205 0 8AM205 0 8A M205 L003 CAMLOCK 8 Way Ribbon Cable C...

Страница 7: ...y Board If Fitted Link Pins 5 6 if Board NOT Fitted Figure 3 Internal Layout 3 4 Detector Circuits The detector circuit accepts smoke detectors heat detectors or manual call points that will cause the panel to go into alarm within one second Detector types used are subject to the compatibility limitations as described in section 4 Devices such as smoke detectors which signal by increasing line cur...

Страница 8: ... on the 302 665B When pressed â a LED directly above the switch will indicate the test is active â the test will remain active for ten minutes automatically cancelling itself after this time â detectors can be operated in the field reset by the panel after four seconds To restore the panel to normal operation repress the switch and the walk test indicator will turn off 3 8 Buzzer The NZ100 has an ...

Страница 9: ...hat decreases the power supply output voltage to approximately 10V for 1 hour each day to check the condition of the system battery If the battery voltage falls below 12 2V during the test period a defect signal is generated and the battery fault LED is illuminated 3 12 Mains On Indicator This LED is illuminated when the mains supply is connected and operational 3 13 Fusing The NZ100 has four fuse...

Страница 10: ...S WIRE IN WIRE OUT WIRE IN TERMINATING METHOD AMPAC 27 0 LED MEASURE LINE VOLTAGE WIRE OUT UP TO 40 DETECTORS CAN BE CONNECTED TO EACH CIRCUIT NOTE TB5 AMPAC MANUAL CALL POINT IN OUT IN OUT SERIES 65 DETECTOR L1 In R L2 Earth L1 Out AMPAC HEAT DETECTOR Figure 4 Example of Detector MCP Wiring The zone circuit must be terminated with an end of line resistor with a value of 6 8K 2 tolerance or better...

Страница 11: ...NZ100 Installation Commissioning Operation Page 7 Connect as shown above ...

Страница 12: ...AS2W Flush sounder White 12 24V 15mA 205 0001 AS2R Flush sounder Red 12 24V 15mA 205 0009 Vara Sounder white AS2220 Evac Tones 205 0011 Vector Sounder white AS2220 Evac Tones 205 0062 Vantage Sounder AS2220 Evac Tones Red 205 0063 Vantage Sounder AS2220 Evac Tones White 205 0066 Vantage Combi Sounder AS2220 Evac Tones Red 205 0067 Vantage Combi Sounder AS2220 Evac Tones White Note these devices do...

Страница 13: ...nt condition When the GATING link K1 2 has been fitted the signal from smoke detectors and electronic heat detectors is verified before an alarm is recognised K1 DEFECTS NOT USED GATING 3 BATT LINK 1 2 Figure 7 K1 Linking Set to GATING and Link Storage to a Single Header Pin 5 2 No Brigade Board If a brigade board is not fitted it is necessary to fit a jumper link from pin 5 to pin 6 of CN3 BRIGAD...

Страница 14: ...on 4 Feed cables into the unit 5 Connect mains cabling to the mains terminal block 6 Anchor incoming Mains cable with cable tie provided through chassis holes provided 5 Connect detector cabling 6 Connect ancillary cabling 7 Set links as required See section 5 12 Ensure all swarf is removed from panel before applying power 6 2 Initial Operation 1 Switch on Mains power to the unit 2 Battery defect ...

Страница 15: ...ble to CN1 8 Terminate Line Transmitter LTX cables to 302 678 9 Set the K1 links to the assigned address 10 Switch power on to NZ100 and connect battery 11 Test the monitoring in accordance with the LTX SDG Input Interface Specifications Note When the SGD is ordered with the panel the SGD will be fitted and programmed prior to delivery Fit 25mm nylon standoffs into 302 665B board Then fit 302 678 ...

Страница 16: ...NZ100 Installation Commissioning Operation Page 12 Figure 9 Brigade Board Installation ...

Страница 17: ...tandard does not allow for long runs 3 Use the 8 way Ribbon supplied to connect CN1 302 5930 to CN4 302 665B 4 Connect the ancillary devices to TB1 The panel is now ready to power up and the relay checked for desired outputs TO CN4 OF THE MAIN SYSTEM BOARD 302 593 N O COM N C N C NORMALLY CLOSED COM COMMON N O NORMALLY OPEN C5 C4 RN1 C3 R7 R1 R6 R5 K3 SELECT R4 U3 LM78L05 K1 ADDRESS CN2 CN1 TB1 C2...

Страница 18: ...ll illuminate The detectors can now be tested When a detector is set into alarm the system will operate as normal for approximately four seconds After this time the detectors on the circuit in alarm will be reset When testing is complete press the Walk Test switch to return to normal The walk test facility has an internal time out and will be de selected automatically after ten 10 minutes of opera...

Страница 19: ... not fitted Fuse blown Fit diodes to bells as shown in section 4 Fit end of line resistor Check fuse F1 on PCB Replace if necessary Zone always in defect Line is shorted Line is open End of line not fitted Check and remove short Check line and rectify Fit 6K8 resistor to end of line System fault light is on Mains is on Brigade board is disconnected No brigade board Connect brigade board Make sure ...

Страница 20: ...ription 55000 217 Apollo Series 65 Ionisation LPC 45µA 35 55000 317 Apollo Series 65 Optical LPC 45µA 35 55000 220 Apollo Series 65 Integrating Ionisation LPC 45µA 35 45681 200 Apollo Series 60 65 universal base N A 201 0501 Apollo Orbis Optical with Flashing LED 65µA 24 201 0505 Apollo Orbis MultiSensor 65µA 24 201 0528 Apollo Orbis universal base N A Beam Detectors Order Code Description 220 000...

Страница 21: ......

Страница 22: ...ralia Tel 61 8 9242 3333 Fax 61 8 9242 3334 Email info ampac net EUROPE AMPAC EUROPE LTD UK Unit 18 Network centre Yorkshire Way West Moor Park Doncaster DN3 3GW United Kingdom Tel 44 0 1302 833 522 Fax 44 0 1302 835 021 Email info eu ampac net NEW ZEALAND AMPAC PACIFIC LTD Unit 4 101 Diana Drive Glenfield Auckland New Zealand Tel 64 9 443 8072 Fax 64 9 443 8073 Email info nz ampac net HEAD OFFICE...

Отзывы: