7.
INSTALLING THE BRIGADE BOARD (SGD type II )
The Brigade Board interfaces to a Line Transmitter to facilitate monitoring by a Fire Brigade or
monitoring service. It can be supplied installed or in fast fit kit form which contains all the necessary
parts for installation. Fitting the board is a simple procedure as detailed and illustrated below.
1.
Turn off power and disconnect the battery.
2.
Fit door switch bracket assembly to top right corner of cabinet with M3 screws supplied.
2.
Fit four nylon standoffs onto 302 - 665B.
4.
Remove the jumper link from CN3 and fit the six-way cable.
5.
Remove the left bottom screw of 302 - 665B and install the earth cable as shown below.
6.
Fit 302 - 678 onto nylon standoffs as shown below.
6.
Connect the six-way cable to CN2 of 302 - 678 and the two-way cable to CN1.
8.
Terminate Line Transmitter ( LTX ) cables to 302 - 678.
9.
Set the K1 links to the assigned address.
10.
Switch power on to NZ100 and connect battery.
11.
Test the monitoring in accordance with the LTX SDG Input Interface Specifications.
Note:
When the SGD is ordered with the panel, the SGD will be fitted and programmed prior to delivery.
Fit 25mm nylon
standoffs into
302 665B board.
Then fit 302 678
board to standoffs.
Fit door switch bracket
with M3 screws.
Fit 6 way cable from CN3 of the
302 - 665B to CN2 302 - 6780
Fit 2 Way cable to door switch.
Fit earth wire
from 302 678
to under screw
of 302 665B.
3A
F 1
0V
F3
0 . 8 A
F 2
C14
TB2
BZ1
D6
SW1
SW2
SW3
CN1
BELL
+
-
-
+
-
WALK
T E S T
BUZZER
MUTE
NORMAL
BELL
SYS.
Z O N E
BATT.
+
AUX
1
2
SECONDARY FUSE
BELL BATT
MAINS ON
15V A.C.
302 665B
BELL
D E T
RESET
+
AMPAC
SGD
Type
II
A
+
-
B
NORMAL
NORMAL
ISOLATE
T E S T
NORMAL
F I R E
DEFECT
ISOLATE
POLL
D O O R
SWITCH
302 678
U7
+
BZ1
C N 1
U3
U4
TB1
U2
R12
U6
U5
SW2
SW1
Cable
to LTX
Interface
& 12 volt
Supply
+
C N 2
F I R E
SYSTEM
K2
K1
F 1
250mA
S D G
ADDRESS
All Links
Off = 16
1
2
3
4
Содержание NZ100 Series
Страница 2: ...NZ100 Installation Commissioning Operation Page 1 ...
Страница 4: ......
Страница 11: ...NZ100 Installation Commissioning Operation Page 7 Connect as shown above ...
Страница 16: ...NZ100 Installation Commissioning Operation Page 12 Figure 9 Brigade Board Installation ...
Страница 21: ......