172
ASC110 / ASC130 / ASC150
3.6.
Individual Operations of Maintenance
1
Every 2000 Hours or Every 2 Years
Every 2000 Hours or Every 2 Years
3.6.31. Exchanging the engine cooling liquid
! NOTE !
Exchange the coolant after operation of the machine
or after warming the coolant (by running the engine)
to 80 °C (176 °C).
•
Place the roller onto a flat, firm surface.
•
Stop the engine.
•
Open cooling system by removing pressure plug (1) on
the equaliser reservoir.
Do not dismantle the pressure plug be-
fore the temperature of cooling liquid
falls lower than to 50 °C (122 °C). Bewa-
re of gushing of the coolant and scalding
when opening the pressure plug.
•
Open the drain cock in the cooler lower chamber. Let
liquid drain into prepared vessels. The quantity drai-
ned is approximately 19 l (5 US gal).
NOTE
•
Check cooling system for defective hoses and missing
hose clips. Check the condition of the cooler - search for
defects, leaks and cooling gills blocked with impurities.
•
Dismantle the drain plug (CE).
Содержание ASC 130
Страница 1: ...Operating manual E ASC 130 Cummins Tier II 5 2006...
Страница 4: ...4 ASC 130...
Страница 6: ...ASC 130...
Страница 12: ...10 ASC 130...
Страница 13: ...11 ASC 130 1 SPECIFICATION MANUAL ASC 130...
Страница 34: ...32 ASC 130...
Страница 35: ...33 ASC 130 SPECIFICATION MANUAL...
Страница 36: ...34 ASC 130 N s e t o...
Страница 37: ...35 ASC 130 SPECIFICATION MANUAL N s e t o...
Страница 38: ...36 ASC 130 N s e t o...
Страница 39: ...37 ASC 130 SPECIFICATION MANUAL N s e t o...
Страница 40: ...38 ASC 130...
Страница 42: ...40 ASC110 ASC130 ASC150 ASC200 ASC250...
Страница 56: ...54 ASC110 ASC130 ASC150 ASC200 ASC250...
Страница 58: ...56 ASC110 ASC130 ASC150 ASC200 ASC250 Controls and control devices 2 6 Controls and control devices...
Страница 64: ...62 ASC110 ASC130 ASC150 ASC200 ASC250 2 6 Controls and control devices...
Страница 66: ...64 ASC110 ASC130 ASC150 ASC200 ASC250 2 6 Controls and control devices...
Страница 68: ...66 ASC110 ASC130 ASC150 ASC200 ASC250 2 6 Controls and control devices...
Страница 70: ...68 ASC110 ASC130 ASC150 ASC200 ASC250 2 6 Controls and control devices...
Страница 72: ...70 ASC110 ASC130 ASC150 ASC200 ASC250 2 6 Controls and control devices...
Страница 87: ...85 ASC110 ASC130 ASC150 ASC200 ASC250 OPERATING INSTRUCTIONS...
Страница 122: ...120 ASC110 ASC130 ASC150 ASC200 ASC250 N s e t o...
Страница 123: ...121 ASC110 ASC130 ASC150 ASC200 ASC250 OPERATING INSTRUCTIONS N s e t o...
Страница 124: ...122 ASC110 ASC130 ASC150 ASC200 ASC250...
Страница 125: ...123 ASC110 ASC130 ASC150 3 MAINTENANCE MANUAL ASC 110 ASC 130 and ASC 150 Cummins tier 2...
Страница 126: ...124 ASC110 ASC130 ASC150...
Страница 134: ...132 ASC110 ASC130 ASC150 3 4 Lubrication and Maintenance Chart...
Страница 135: ...133 ASC110 ASC130 ASC150 MAINTENANCE MANUAL...
Страница 136: ...134 ASC110 ASC130 ASC150 3 5 Lubrication Chart...
Страница 186: ...184 ASC110 ASC130 ASC150 3 6 Individual Operations of Maintenance...
Страница 189: ...187 ASC110 ASC130 ASC150 MAINTENANCE MANUAL...
Страница 190: ...188 ASC110 ASC130 ASC150 3 8 Appendixes...
Страница 191: ...189 ASC110 ASC130 ASC150 MAINTENANCE MANUAL...
Страница 193: ...191 ASC110 ASC130 ASC150 MAINTENANCE MANUAL...
Страница 195: ...193 ASC110 ASC130 ASC150 MAINTENANCE MANUAL...
Страница 196: ...194 ASC110 ASC130 ASC150 3 8 Appendixes N s e t o...
Страница 197: ...195 ASC110 ASC130 ASC150 MAINTENANCE MANUAL N s e t o...
Страница 198: ...N s e t o...