![Amit AIPQB1215WA61/01 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/amit/aipqb1215wa61-01/aipqb1215wa61-01_operation-manual_2933414015.webp)
AIPQB1215WA61/01
15/36
aipqb1215wa6101_g_en_101
4. Power supply
Power supply DC voltage is connected to terminals Vcc and GND of PWR
connector.
The power supply conductors cross-section must be at least 0.75 mm
2
.
TFT panel is switched on after attaching the supply voltage. Initialization
process takes approximately 1 minute. First, during the initialization, the initial
logo is displayed shortly. Followed by short acoustic signal. After that user
application is launched.
PIN
Signal
Type of signal on AIPQB1215WA61/01
4
GND
Power supply, GND
5
Vcc
Power supply, +24 V DC
6
PE
Monitor chassis
The PE terminal is internally connected with TFT panel cover and with metal
caps of all connectors. When installing, it is recommended to connect the PE
terminal in single point of switchboard with chassis of equipment where the TFT
panel is installed.
PWR
X1
ETH
X3
AUDIO + RS422
X4
1
LNK
SYS
ACT
HDD
USB
X2
D
IO
2
1
D
IO
1
2
SB
3
G
N
D
4
Vc
c
5
PE
6
Fig. 7 - Location of
AIPQB1215WA61/01
power supply connector
Number
Meaning
1
Connector X1
– Power supply
4.1. Turning TFT panel on and off
TFT panel is turned on after connection of power supply to Vcc and GND
terminals and activation by SB signal.
WAGO
connector
wiring
Connecting
to PE
Connector
location
Legend