background image

BackboxCV installation

02

Check which version of the BackboxCV you 
have before following this section

Create 455 x 205mm (17.9 x 8.1”) aperture 
(CV200)
Create 405 x 305mm (15.9 x 12“) aperture 
(CV300)
Create 455 x 350mm (17.9 x 13.8”) aperture 
(CV345)

Using a sharp knife or pad saw, cut an 
aperture in your plasterboard wall or ceiling. 
Ensure the aperture is created between 
supporting joists or stud work.

We strongly advise that joists are not cut to 
make space for the backbox. Any activity of 
this sort may well influence the structural 
integrity of your property.

Important: Double check the size of the 
aperture, as this is important further on into 
the installation process.

01

02

02

sharp knife

pad saw

Fitting the BackboxCV

Locate joist work

When you have chosen your speaker 
locations, before cutting a hole in the 
plasterboard it is important that you locate 
the position of the wall studs. Ensure the 
spacing between them is at least 5mm 
greater than the width of your Amina 
speaker for a portrait orientated speaker.

350mm (CV345)

305mm (CV300)
205mm (CV200)

(minimum)

cut a small

hole in plasterboard

to check stud location

01

Содержание BackboxCV 200

Страница 1: ...Installation Guide BackboxCV V1 0August2013 345 300 200...

Страница 2: ...ationsteps5 6 Alignmentandplasteringpreparation retrofit patchtechnique Alignmentandplasteringpreparation retrofit feathertechnique Alignmentandplasteringpreparation fullwet skim Alignmentforpatchplas...

Страница 3: ...ill trav el some considerable distance u p dow nandalongthewallorceilingstructure It is therefore recommended the product be fitt ed w ithin acoust icallyinsulat edstudwallsorceilingswhere possible En...

Страница 4: ...cludes step bystep instructions on the correctwaytodothisinordertoaligntheAminaInvisible loudspeaker for plastering CAUTION T akecarewhenremovingtheBackboxCVfrom the carton ThepackagingfortheBackboxCV...

Страница 5: ...orthebackbox Anyactivityof thissortmaywellinfluencethestructural integrityofyourproperty Important Doublecheckthesizeofthe aperture asthisisimportantfurtheroninto theinstallationprocess 01 02 02 sharp...

Страница 6: ...ositionBackboxCV Pullthespeakercablethroughtherubber grommetinthetopsideoftheBackboxCV andensurespeakercablesarepulled throughwithamanageablelengthavailable Doingthiswillmakeiteasiertoconnectthe cable...

Страница 7: ...orplasterboardthicker than12 5mm 1 2 fit shimsbetweenspeakerandspeaker mountinglip Forplasterboardthinner than12 5mm 1 2 fit shimsbetweenthebackoftheplasterboard andthebackboxmountinglip BackboxCV ins...

Страница 8: ...thepaperfaceoftheplasterboard iftheBackboxCVhasbeenfittedcorrectly Thismethodpositionsthespeakertobe patchplasteredwitha2mm 5 64 skim acrossthespeakerfront blendedwiththe existingplasterontheplasterbo...

Страница 9: ...ouldbeflushwiththe frontfaceoftheexistingpainted plastered wall ceiling Thismethodpositionsthespeakersothata muchlargerareaaroundit approx 1m2 39 canbeskimmed This2mm 5 64 thickskimisthenfeatheredoutw...

Страница 10: ...ceofthespeakershouldbeflush withthefaceofthenewwall ceilingifthe BackboxCVhasbeencorrectlyinstalled Thismethodpositionsthespeakertobeskim plasteredoverduringtheprocessofthe entirewall ceilingbeingplas...

Страница 11: ...led Fornewdrywallwalls ceilingsthatw illbe tapedandjoined NorthAmericanconstruct ion Thismethodpositionsthespeakertobe patchplasteredwitha2mm 5 64 skim acrossthespeakerfrontandblendedwith thedrywall A...

Страница 12: ...eofthenewwall ceilingifthe BackboxCViscorrectlyinstalled raw drywall surface Thismethodpositionsthespeakerforalarge area approx 1m2 39 tobeskimmedover it This2mm 5 64 thickskimisthen featheredoutwarda...

Страница 13: ...endsyouleavethe PV Atodryforatleastseveralhours thiswill ensurethepanelsurfaceandsurrounding areasaretotallydry sealedandreadyfor plastering 01 Fillgapbetweenspeakerandsurrounding area Itisimportantto...

Страница 14: ...properoperationand sonicperformance nomorethan2mm 5 64 ofplastermustbeappliedtothe surfaceofthepanel Theworkingenvironmentmustbedry enoughtoallowtheplasterfinishcoattodry withinhours notdays Note Amin...

Страница 15: ...ment for details available on our websites or alternatively contactusviaemailonanyoftheaboveaddresses ImportantNote Thisproductdoesnotcomplyto European Construction Products Directive EN 54 24 andther...

Страница 16: ...AminaT echnologies Ltd Cirrus House Glebe Road Huntingdon Cambs PE29 7DL England T 441480354390 E inspired amina co uk...

Отзывы: