background image

1

2

3

4

5

Packaging

01

Introduction

Overview

Thank you for purchasing the Amina Technologies BackboxCV. This product has been designed to 
enhance the installation of your Amina Invisible loudspeakers by providing an optimised enclosure for 
them to operate in. The BackboxCV provides 17dB SPL reduction from 200Hz and above (-25dB at 
1kHz) of an Amina Invisible loudspeaker’s rearward sound output into the wall or ceiling cavity.

The BackboxCV is relatively simple to install and this guide includes step by step instructions on the 
correct way to do this in order to align the Amina Invisible loudspeaker for plastering.

 CAUTION:

Take care when removing the BackboxCV from the carton.

The packaging for the BackboxCV has been carefully designed to protect the product during transit. 
Please retain it in the unlikely event you need to return the product to your dealer or manufacturer. 
Please recycle the packaging should you wish to dispose of it.

The BackboxCV outer carton is made up of 80% recycled single wall board.
The BackboxCV is formed from a fully recyclable  aluminium enclosure.

Fold out support tabs
Rubber grommet
Speaker mounting lip
Backbox mounting lip
Soundproofing layer
Speaker fixing holes

1

2

3

4

5

6

6

Содержание BackboxCV 200

Страница 1: ...Installation Guide BackboxCV V1 0August2013 345 300 200...

Страница 2: ...ationsteps5 6 Alignmentandplasteringpreparation retrofit patchtechnique Alignmentandplasteringpreparation retrofit feathertechnique Alignmentandplasteringpreparation fullwet skim Alignmentforpatchplas...

Страница 3: ...ill trav el some considerable distance u p dow nandalongthewallorceilingstructure It is therefore recommended the product be fitt ed w ithin acoust icallyinsulat edstudwallsorceilingswhere possible En...

Страница 4: ...cludes step bystep instructions on the correctwaytodothisinordertoaligntheAminaInvisible loudspeaker for plastering CAUTION T akecarewhenremovingtheBackboxCVfrom the carton ThepackagingfortheBackboxCV...

Страница 5: ...orthebackbox Anyactivityof thissortmaywellinfluencethestructural integrityofyourproperty Important Doublecheckthesizeofthe aperture asthisisimportantfurtheroninto theinstallationprocess 01 02 02 sharp...

Страница 6: ...ositionBackboxCV Pullthespeakercablethroughtherubber grommetinthetopsideoftheBackboxCV andensurespeakercablesarepulled throughwithamanageablelengthavailable Doingthiswillmakeiteasiertoconnectthe cable...

Страница 7: ...orplasterboardthicker than12 5mm 1 2 fit shimsbetweenspeakerandspeaker mountinglip Forplasterboardthinner than12 5mm 1 2 fit shimsbetweenthebackoftheplasterboard andthebackboxmountinglip BackboxCV ins...

Страница 8: ...thepaperfaceoftheplasterboard iftheBackboxCVhasbeenfittedcorrectly Thismethodpositionsthespeakertobe patchplasteredwitha2mm 5 64 skim acrossthespeakerfront blendedwiththe existingplasterontheplasterbo...

Страница 9: ...ouldbeflushwiththe frontfaceoftheexistingpainted plastered wall ceiling Thismethodpositionsthespeakersothata muchlargerareaaroundit approx 1m2 39 canbeskimmed This2mm 5 64 thickskimisthenfeatheredoutw...

Страница 10: ...ceofthespeakershouldbeflush withthefaceofthenewwall ceilingifthe BackboxCVhasbeencorrectlyinstalled Thismethodpositionsthespeakertobeskim plasteredoverduringtheprocessofthe entirewall ceilingbeingplas...

Страница 11: ...led Fornewdrywallwalls ceilingsthatw illbe tapedandjoined NorthAmericanconstruct ion Thismethodpositionsthespeakertobe patchplasteredwitha2mm 5 64 skim acrossthespeakerfrontandblendedwith thedrywall A...

Страница 12: ...eofthenewwall ceilingifthe BackboxCViscorrectlyinstalled raw drywall surface Thismethodpositionsthespeakerforalarge area approx 1m2 39 tobeskimmedover it This2mm 5 64 thickskimisthen featheredoutwarda...

Страница 13: ...endsyouleavethe PV Atodryforatleastseveralhours thiswill ensurethepanelsurfaceandsurrounding areasaretotallydry sealedandreadyfor plastering 01 Fillgapbetweenspeakerandsurrounding area Itisimportantto...

Страница 14: ...properoperationand sonicperformance nomorethan2mm 5 64 ofplastermustbeappliedtothe surfaceofthepanel Theworkingenvironmentmustbedry enoughtoallowtheplasterfinishcoattodry withinhours notdays Note Amin...

Страница 15: ...ment for details available on our websites or alternatively contactusviaemailonanyoftheaboveaddresses ImportantNote Thisproductdoesnotcomplyto European Construction Products Directive EN 54 24 andther...

Страница 16: ...AminaT echnologies Ltd Cirrus House Glebe Road Huntingdon Cambs PE29 7DL England T 441480354390 E inspired amina co uk...

Отзывы: