background image

Installation Guide

BackboxCV

V1.0 August 2013                                        345/ 300/ 200

Содержание BackboxCV 200

Страница 1: ...Installation Guide BackboxCV V1 0August2013 345 300 200...

Страница 2: ...ationsteps5 6 Alignmentandplasteringpreparation retrofit patchtechnique Alignmentandplasteringpreparation retrofit feathertechnique Alignmentandplasteringpreparation fullwet skim Alignmentforpatchplas...

Страница 3: ...ill trav el some considerable distance u p dow nandalongthewallorceilingstructure It is therefore recommended the product be fitt ed w ithin acoust icallyinsulat edstudwallsorceilingswhere possible En...

Страница 4: ...cludes step bystep instructions on the correctwaytodothisinordertoaligntheAminaInvisible loudspeaker for plastering CAUTION T akecarewhenremovingtheBackboxCVfrom the carton ThepackagingfortheBackboxCV...

Страница 5: ...orthebackbox Anyactivityof thissortmaywellinfluencethestructural integrityofyourproperty Important Doublecheckthesizeofthe aperture asthisisimportantfurtheroninto theinstallationprocess 01 02 02 sharp...

Страница 6: ...ositionBackboxCV Pullthespeakercablethroughtherubber grommetinthetopsideoftheBackboxCV andensurespeakercablesarepulled throughwithamanageablelengthavailable Doingthiswillmakeiteasiertoconnectthe cable...

Страница 7: ...orplasterboardthicker than12 5mm 1 2 fit shimsbetweenspeakerandspeaker mountinglip Forplasterboardthinner than12 5mm 1 2 fit shimsbetweenthebackoftheplasterboard andthebackboxmountinglip BackboxCV ins...

Страница 8: ...thepaperfaceoftheplasterboard iftheBackboxCVhasbeenfittedcorrectly Thismethodpositionsthespeakertobe patchplasteredwitha2mm 5 64 skim acrossthespeakerfront blendedwiththe existingplasterontheplasterbo...

Страница 9: ...ouldbeflushwiththe frontfaceoftheexistingpainted plastered wall ceiling Thismethodpositionsthespeakersothata muchlargerareaaroundit approx 1m2 39 canbeskimmed This2mm 5 64 thickskimisthenfeatheredoutw...

Страница 10: ...ceofthespeakershouldbeflush withthefaceofthenewwall ceilingifthe BackboxCVhasbeencorrectlyinstalled Thismethodpositionsthespeakertobeskim plasteredoverduringtheprocessofthe entirewall ceilingbeingplas...

Страница 11: ...led Fornewdrywallwalls ceilingsthatw illbe tapedandjoined NorthAmericanconstruct ion Thismethodpositionsthespeakertobe patchplasteredwitha2mm 5 64 skim acrossthespeakerfrontandblendedwith thedrywall A...

Страница 12: ...eofthenewwall ceilingifthe BackboxCViscorrectlyinstalled raw drywall surface Thismethodpositionsthespeakerforalarge area approx 1m2 39 tobeskimmedover it This2mm 5 64 thickskimisthen featheredoutwarda...

Страница 13: ...endsyouleavethe PV Atodryforatleastseveralhours thiswill ensurethepanelsurfaceandsurrounding areasaretotallydry sealedandreadyfor plastering 01 Fillgapbetweenspeakerandsurrounding area Itisimportantto...

Страница 14: ...properoperationand sonicperformance nomorethan2mm 5 64 ofplastermustbeappliedtothe surfaceofthepanel Theworkingenvironmentmustbedry enoughtoallowtheplasterfinishcoattodry withinhours notdays Note Amin...

Страница 15: ...ment for details available on our websites or alternatively contactusviaemailonanyoftheaboveaddresses ImportantNote Thisproductdoesnotcomplyto European Construction Products Directive EN 54 24 andther...

Страница 16: ...AminaT echnologies Ltd Cirrus House Glebe Road Huntingdon Cambs PE29 7DL England T 441480354390 E inspired amina co uk...

Отзывы: