AMI Kit-CJE B75B Скачать руководство пользователя страница 5

 

 

Page 5 of 5 

 

 

22166958 

 

 

REV. A 

Power up Testing 

 

1.  Plug the jukebox back into the wall then power up the jukebox and ensure the jukebox UI comes up. 

This will take some time and may include one or more reboots. 

2.  In order for the jukebox to connect to the AMI network, the MAC address of the computer core must 

be entered into the AMI database. This will require a phone call to the AMI Tech Support line, 1-877-
ROC-N-ROL (1-877-762-6765). 

a.  The MAC address is found on a Service Mode screen.  

b.  If the jukebox is not in the Service Mode, push the Service button on the core computer.  

c.  Push the Calibrate button on the core computer and calibrate the touch screen. 

d.  Touch Diagnostics then touch System Information. The MAC address will be displayed in the third 

block down from the top right. 

e.  To help the AMI Tech Support technician configure your jukebox in the AMI system, please have 

the  jukebox  model  and  serial  number  along  with  the  MAC  address  when  you  call.  Inform  the 
technician you are installing the new motherboard upgrade kit. 

3.  After Tech Support has entered the MAC  address of the jukebox,  you  will need  to enter the Trigger 

Code for the hard drive. 

a.  From  the  main  menu  in  the  Service  Mode,  touch  System  Setup  then  touch  Enable/Extend 

Features. 

b.  Using the on-screen keyboard, enter the trigger code found on the Trigger Code Card (Item #8) 

then touch the Send Code button. 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание Kit-CJE B75B

Страница 1: ...Required 2 Phillips Screwdriver Nut Driver Parts Included with this Kit Item Part Number Description Quantity 1 40924220 B75B Motherboard 1 2 22350001 Hard Drive SSD Win10 US 1 3 34052405 CBA Power On Reset 1 4 22132269 Cable Assembly COM To I O 1 5 22132270 Cable Assembly Power On Reset 1 6 22157606 License Windows 10 1 7 22167738 Label 61197014 1 8 22188403 Card Trigger Code Not Shown 1 These In...

Страница 2: ...overs to access the motherboard Unplug and remove all of the ATX power supply and I O board connections from the motherboard Remove the Power and SATA DATA cable from the hard drive Remove the modem card and its PCI cover from the motherboard if present It will not be reused Remove the three screws securing the power supply to the computer core chassis Carefully rotate the power supply out of the ...

Страница 3: ...nstall into your computer Core using the same two screws Connect the other end of the cable to the F Panel header of the B75B Motherboard See Figure 3 9 Connect the COM TO I O Cable Assembly 22132269 Item 4 to the keyed 10 pin header of the I O board still mounted in the computer core chassis Connect the other end of the cable to the COM 1 header of the B75B motherboard See Figure 3 10 Connect the...

Страница 4: ... shown in Figure 4 13 Reattach the covers and apply the new core computer part number label Item 7 over the top of the original core computer part number 14 Reinstall the modified Computer Core into the jukebox Reconnect all cables removed in step 2 Take a moment to visually inspect the jukebox to ensure proper connections before powering up the jukebox 15 Attach the Windows 10 License Item 6 labe...

Страница 5: ...Calibrate button on the core computer and calibrate the touch screen d Touch Diagnostics then touch System Information The MAC address will be displayed in the third block down from the top right e To help the AMI Tech Support technician configure your jukebox in the AMI system please have the jukebox model and serial number along with the MAC address when you call Inform the technician you are in...

Страница 6: ...AMI Entertainment Network LLC 4147 Eastern Ave SE Grand Rapids MI 49508 ...

Отзывы: